Assessment Year | 2012 |
---|---|
Principal Product | Pneumatic Valves |
NAICS | 332912: Fluid Power Valve and Hose Fitting Manufacturing |
SIC | 3492: Fluid Power Valves and Hose Fittings |
Sales Range | $10 M to 50M |
# of Employees | 40 |
Plant Area |
50,000
ft2
|
Annual Production | 50,000
units
|
Production Hrs. Annual | 4,862
hrs
|
Location (State) | New Jersey |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $111,951 | 1,039,860 |
kWh
|
$0.11 |
Electricity Demand | $26,963 | 5,317 |
kW-mo/yr
|
$5.07 |
Electricity Fees | $32,366 | - |
|
- |
Natural Gas | $18,891 | 1,921 |
MMBtu
|
$9.83 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $48,946 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $26,796 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $19,980 | $36,125 |
$17,756
164,403
kWh
|
$1,653
-
kW-mo/yr
|
- | $571 | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $656 | $1,750 |
$539
4,992
kWh
|
$71
-
kW-mo/yr
|
- | $46 | |
03 | 2.4226: Use / purchase optimum sized compressor | $5,403 | $600 |
$4,779
44,254
kWh
|
$624
-
kW-mo/yr
|
- | - | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $5,619 | $16,000 |
$5,279
48,878
kWh
|
$340
-
kW-mo/yr
|
- | - | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $6,160 | $949 |
$1,511
13,991
kWh
|
$4,649
-
kW-mo/yr
|
- | - | |
06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,536 | $1,000 |
$1,445
13,376
kWh
|
$91
-
kW-mo/yr
|
- | - | |
07 | 2.7441: Replace broken windows and/or window sash | $8,859 | $44,000 | - | - |
$8,859
-
MMBtu
|
- | |
08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $733 | $2,542 |
$348
3,224
kWh
|
$45
-
kW-mo/yr
|
- | $340 | |
TOTAL RECOMMENDED | $48,946 | $102,966 |
$31,657
293,118
kWh
|
$7,473
-
kW-mo/yr
|
$8,859
-
MMBtu
|
$957 | ||
TOTAL IMPLEMENTED | $26,796 | $38,824 |
$19,806
183,386
kWh
|
$6,373
-
kW-mo/yr
|
- | $617 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs