ITAC Assessment: CO0612
ITAC logo
ITAC Assessment: CO0612
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2008
Principal Product Kitchen & bathroom cabinets
NAICS 337110: Wood Kitchen Cabinet and Countertop Manufacturing
SIC 2434: Wood Kitchen Cabinets
Sales Range $10
M
to 50
M
# of Employees 161
Plant Area 199,000
ft2
Annual Production 125,000
pieces
Production Hrs. Annual 2,860
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $70,779 2,154,555
kWh
Electricity Demand $143,624 8,761
kW-mo/yr
Electricity Fees $384 -
Natural Gas $85,222 10,160
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $38,700 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,080

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.3191: Use demand controller or load shedder $13,590 $59,400 $1,150
31,100
kWh
$5,990
-
kW-mo/yr
- - $6,450
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,920 $300 $1,280
34,600
kWh
$640
-
kW-mo/yr
- - -
03 2.4235: Remove or close off unneeded compressed air lines $160 $450 $160
4,200
kWh
- - - -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $14,400 $25,650 $5,490
148,100
kWh
$8,910
-
kW-mo/yr
- - -
05 2.7135: Install occupancy sensors $5,270 $10,430 $1,720
46,300
kWh
$3,290
-
kW-mo/yr
- $180 $80
06 2.7243: Improve air circulation with destratification fans / other methods $1,930 $15,400 $(-460.0)
(-12,300)
kWh
$(-290.0)
-
kW-mo/yr
$2,680
-
MMBtu
- -
07 2.7447: Install vinyl strip / high speed / air curtain doors $1,430 $960 - - $1,430
-
MMBtu
- -
TOTAL RECOMMENDED $38,700 $112,590 $9,340
252,000
kWh
$18,540
-
kW-mo/yr
$4,110
-
MMBtu
$180 $6,530
TOTAL IMPLEMENTED $2,080 $750 $1,440
38,800
kWh
$640
-
kW-mo/yr
- - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs