ITAC Assessment: OK0516
ITAC logo
ITAC Assessment: OK0516
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product surgical cameras
NAICS
n/a
SIC 3842: Orthopedic, Prosthetic, and Surgical Appliances and Supplies
Sales Range $10
M
to 50
M
# of Employees 0
Plant Area 60,000
ft2
Annual Production 14,400
pieces
Production Hrs. Annual 2,470
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $23,196 791,618
kWh
Electricity Demand $24,514 2,182
kW-mo/yr
Electricity Fees $876 -
Natural Gas $4,807 846
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $8,291 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,788

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings
01 2.6232: Install set-back timers $2,215 $3,472 - $2,215
-
MMBtu
- -
02 3.6192: Use a less expensive method of waste removal $5,088 - - - $5,088
-
lb
-
03 2.7135: Install occupancy sensors $415 $1,056 $415
5,275
kWh
- - -
04 2.1311: Replace electrically-operated equipment with fossil fuel equipment $304 $542 $451
6,741
kWh
$(-147.0)
-
MMBtu
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $269 $395 $129
2,931
kWh
- - $140
TOTAL RECOMMENDED $8,291 $5,465 $995
14,947
kWh
$2,068
-
MMBtu
$5,088
-
lb
$140
TOTAL IMPLEMENTED $2,788 $4,409 $580
9,672
kWh
$2,068
-
MMBtu
- $140
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs