Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product Carbon Flat Roll Products
NAICS 331221: Rolled Steel Shape Manufacturing
SIC 3316: Cold-Rolled Steel Sheet, Strip, and Bars
Sales Range less than $500
k
# of Employees 62
Plant Area 200,000
ft2
Annual Production 60,000
ton
Production Hrs. Annual 6,240
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $73,794 1,054,200
kWh
Electricity Demand $21,653 10,137
kW-mo/yr
Natural Gas $56,586 4,556
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $136,893 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $10,518

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Ancillary Material Cost Savings
01 2.9114: Use solar heat to make electricty $66,813 - - - $66,813 - -
02 2.7312: Minimize use of outside make-up air for ventilation except when used for economizer cycle $16,976 $7,660 - - - $16,976
-
MMBtu
-
03 2.7243: Improve air circulation with destratification fans / other methods $12,677 $25,375 - - - $12,677
-
MMBtu
-
04 2.7135: Install occupancy sensors $9,659 $24,370 $10,012
143,030
kWh
$13
-
kW-mo/yr
- - $(-366.0)
05 2.4226: Use / purchase optimum sized compressor $8,856 $28,000 $8,364
119,479
kWh
$492
-
kW-mo/yr
- - -
06 2.7447: Install vinyl strip / high speed / air curtain doors $7,328 $23,400 - - - $7,328
-
MMBtu
-
07 4.625: Develop standard operating procedures $6,689 - $6,689
95,583
kWh
- - - -
08 2.4231: Reduce the pressure of compressed air to the minimum required $3,829 $40 $3,616
51,660
kWh
$213
-
kW-mo/yr
- - -
09 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,360 $6,400 $3,006
42,952
kWh
$354
-
kW-mo/yr
- - -
10 2.7142: Utilize higher efficiency lamps and/or ballasts $706 $4,580 $710
10,152
kWh
$4
-
kW-mo/yr
- - $(-7.4)
TOTAL RECOMMENDED $136,893 $119,825 $32,397
462,856
kWh
$1,076
-
kW-mo/yr
$66,813 $36,981
-
MMBtu
$(-373.4)
TOTAL IMPLEMENTED $10,518 $40 $10,305
147,243
kWh
$213
-
kW-mo/yr
- - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Ancillary Material Cost Savings