Assessment Year | 2011 |
---|---|
Principal Product | Lass 80 Heavy Duty Trucks |
NAICS | 336120: Heavy Duty Truck Manufacturing |
SIC | 3711: Motor Vehicles and Passenger Car Bodies |
Sales Range | $50 M to 100M |
# of Employees | 107 |
Plant Area |
930,000
ft2
|
Annual Production | 11,800
pieces
|
Production Hrs. Annual | 2,080
hrs
|
Location (State) | Pennsylvania |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $767,104 | 11,218,000 |
kWh
|
$0.068 |
Electricity Demand | $13,967 | 26,230 |
kW-mo/yr
|
$0.53 |
Natural Gas | $643,875 | 70,486 |
MMBtu
|
$9.13 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $312,637 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $156,891 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.7243: Improve air circulation with destratification fans / other methods | $92,227 | $175,000 |
$40,160
590,594
kWh
|
$939
-
kW-mo/yr
|
$51,128
-
MMBtu
|
|
02 | 2.1224: Replace boiler | $91,620 | $240,000 | - | - |
$91,620
-
MMBtu
|
|
03 | 2.7261: Install timers and/or thermostats | $61,378 | $125 |
$27,305
401,549
kWh
|
- |
$34,073
-
MMBtu
|
|
04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $42,335 | $94,400 |
$41,404
608,880
kWh
|
$931
-
kW-mo/yr
|
- | |
05 | 2.4322: Use or replace with energy efficient substitutes | $15,778 | $2,102 |
$15,624
229,764
kWh
|
$154
-
kW-mo/yr
|
- | |
06 | 2.7135: Install occupancy sensors | $5,653 | $7,280 |
$5,653
83,121
kWh
|
- | - | |
07 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,286 | $1,900 |
$3,211
47,226
kWh
|
$75
-
kW-mo/yr
|
- | |
08 | 2.4221: Install compressor air intakes in coolest locations | $360 | $400 |
$350
5,144
kWh
|
$10
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $312,637 | $521,207 |
$133,707
1,966,278
kWh
|
$2,109
-
kW-mo/yr
|
$176,821
-
MMBtu
|
||
TOTAL IMPLEMENTED | $156,891 | $177,025 |
$70,676
1,039,369
kWh
|
$1,014
-
kW-mo/yr
|
$85,201
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs