ITAC Assessment: LE0327
ITAC logo
ITAC Assessment: LE0327
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2011
Principal Product Lass 80 Heavy Duty Trucks
NAICS 336120: Heavy Duty Truck Manufacturing
SIC 3711: Motor Vehicles and Passenger Car Bodies
Sales Range $50
M
to 100
M
# of Employees 107
Plant Area 930,000
ft2
Annual Production 11,800
pieces
Production Hrs. Annual 2,080
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $767,104 11,218,000
kWh
Electricity Demand $13,967 26,230
kW-mo/yr
Natural Gas $643,875 70,486
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $312,637 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $156,891

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7243: Improve air circulation with destratification fans / other methods $92,227 $175,000 $40,160
590,594
kWh
$939
-
kW-mo/yr
$51,128
-
MMBtu
02 2.1224: Replace boiler $91,620 $240,000 - - $91,620
-
MMBtu
03 2.7261: Install timers and/or thermostats $61,378 $125 $27,305
401,549
kWh
- $34,073
-
MMBtu
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $42,335 $94,400 $41,404
608,880
kWh
$931
-
kW-mo/yr
-
05 2.4322: Use or replace with energy efficient substitutes $15,778 $2,102 $15,624
229,764
kWh
$154
-
kW-mo/yr
-
06 2.7135: Install occupancy sensors $5,653 $7,280 $5,653
83,121
kWh
- -
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,286 $1,900 $3,211
47,226
kWh
$75
-
kW-mo/yr
-
08 2.4221: Install compressor air intakes in coolest locations $360 $400 $350
5,144
kWh
$10
-
kW-mo/yr
-
TOTAL RECOMMENDED $312,637 $521,207 $133,707
1,966,278
kWh
$2,109
-
kW-mo/yr
$176,821
-
MMBtu
TOTAL IMPLEMENTED $156,891 $177,025 $70,676
1,039,369
kWh
$1,014
-
kW-mo/yr
$85,201
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs