ITAC Assessment: LE0309
ITAC logo
ITAC Assessment: LE0309
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2010
Principal Product fluid milk
NAICS 311511: Fluid Milk Manufacturing
SIC 2026: Fluid Milk
Sales Range $1
M
to 5
M
# of Employees 252
Plant Area 74,000
ft2
Annual Production 62,500
Tgal
Production Hrs. Annual 5,616
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $532,726 8,462,709
kWh
Electricity Demand $159,296 22,856
kW-mo/yr
Natural Gas $452,690 49,648
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $305,297 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $88,267

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Ancillary Material Cost Savings
01 2.4226: Use / purchase optimum sized compressor $189,768 $90,000 $149,907
2,379,476
kWh
$39,861
-
kW-mo/yr
- -
02 2.2511: Insulate bare equipment $23,403 $5,772 - - $23,403
-
MMBtu
-
03 2.7261: Install timers and/or thermostats $21,770 $250 $10,453
165,927
kWh
- $11,317
-
MMBtu
-
04 2.4226: Use / purchase optimum sized compressor $16,145 $20,000 $12,751
202,393
kWh
$3,394
-
kW-mo/yr
- -
05 2.2442: Preheat combustion air with waste heat $11,117 $30,000 - - $11,117
-
MMBtu
-
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $6,925 - $5,687
90,276
kWh
$1,238
-
kW-mo/yr
- -
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $6,657 $1,000 $5,259
83,478
kWh
$1,398
-
kW-mo/yr
- -
08 2.4231: Reduce the pressure of compressed air to the minimum required $5,494 $40 $5,494
87,208
kWh
- - -
09 2.7142: Utilize higher efficiency lamps and/or ballasts $24,018 $2,431 $17,331
275,089
kWh
$4,609
-
kW-mo/yr
- $2,078
TOTAL RECOMMENDED $305,297 $149,493 $206,882
3,283,847
kWh
$50,500
-
kW-mo/yr
$45,837
-
MMBtu
$2,078
TOTAL IMPLEMENTED $88,267 $9,493 $44,224
701,978
kWh
$7,245
-
kW-mo/yr
$34,720
-
MMBtu
$2,078
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs