ITAC Assessment: LE0305
ITAC logo
ITAC Assessment: LE0305
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2010
Principal Product books
NAICS 323117: Books Printing
SIC 2732: Book Printing
Sales Range less than $500
k
# of Employees 321
Plant Area 475,000
ft2
Annual Production 79,000,000
pieces
Production Hrs. Annual 8,736
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $742,841 13,905,600
kWh
Electricity Demand $237,195 27,286
kW-mo/yr
Natural Gas $610,699 49,862
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $237,090 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.2437: Recover waste heat from equipment $81,866 $60,000 - - $81,866
-
MMBtu
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $47,762 $17,000 $38,430
725,111
kWh
$9,332
-
kW-mo/yr
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $28,242 $1,720 $22,350
421,707
kWh
$5,892
-
kW-mo/yr
-
04 2.4226: Use / purchase optimum sized compressor $27,533 - $10,935
206,333
kWh
$16,598
-
kW-mo/yr
-
05 2.7261: Install timers and/or thermostats $15,838 $250 $8,537
161,073
kWh
- $7,301
-
MMBtu
06 2.2614: Use cooling tower or economizer to replace chiller cooling $12,566 $35,000 $10,256
193,509
kWh
$2,310
-
kW-mo/yr
-
07 2.3131: Reschedule plant operations or reduce load to avoid peaks $11,857 - - $11,857
-
kW-mo/yr
-
08 2.4221: Install compressor air intakes in coolest locations $8,426 $2,800 $6,245
117,836
kWh
$2,181
-
kW-mo/yr
-
09 2.7135: Install occupancy sensors $3,000 $900 $3,000
56,609
kWh
- -
TOTAL RECOMMENDED $237,090 $117,670 $99,753
1,882,178
kWh
$48,170
-
kW-mo/yr
$89,167
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs