Assessment Year | 2010 |
---|---|
Principal Product | books |
NAICS | 323117: Books Printing |
SIC | 2732: Book Printing |
Sales Range | less than $500 k |
# of Employees | 321 |
Plant Area |
475,000
ft2
|
Annual Production | 79,000,000
pieces
|
Production Hrs. Annual | 8,736
hrs
|
Location (State) | Pennsylvania |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $742,841 | 13,905,600 |
kWh
|
$0.053 |
Electricity Demand | $237,195 | 27,286 |
kW-mo/yr
|
$8.69 |
Natural Gas | $610,699 | 49,862 |
MMBtu
|
$12.25 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $237,090 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.2437: Recover waste heat from equipment | $81,866 | $60,000 | - | - |
$81,866
-
MMBtu
|
|
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $47,762 | $17,000 |
$38,430
725,111
kWh
|
$9,332
-
kW-mo/yr
|
- | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $28,242 | $1,720 |
$22,350
421,707
kWh
|
$5,892
-
kW-mo/yr
|
- | |
04 | 2.4226: Use / purchase optimum sized compressor | $27,533 | - |
$10,935
206,333
kWh
|
$16,598
-
kW-mo/yr
|
- | |
05 | 2.7261: Install timers and/or thermostats | $15,838 | $250 |
$8,537
161,073
kWh
|
- |
$7,301
-
MMBtu
|
|
06 | 2.2614: Use cooling tower or economizer to replace chiller cooling | $12,566 | $35,000 |
$10,256
193,509
kWh
|
$2,310
-
kW-mo/yr
|
- | |
07 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $11,857 | - | - |
$11,857
-
kW-mo/yr
|
- | |
08 | 2.4221: Install compressor air intakes in coolest locations | $8,426 | $2,800 |
$6,245
117,836
kWh
|
$2,181
-
kW-mo/yr
|
- | |
09 | 2.7135: Install occupancy sensors | $3,000 | $900 |
$3,000
56,609
kWh
|
- | - | |
TOTAL RECOMMENDED | $237,090 | $117,670 |
$99,753
1,882,178
kWh
|
$48,170
-
kW-mo/yr
|
$89,167
-
MMBtu
|
||
TOTAL IMPLEMENTED | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs