ITAC Assessment: LE0304
ITAC logo
ITAC Assessment: LE0304
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2010
Principal Product elevator and mining parts
NAICS 332710: Machine Shops
SIC 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 121
Plant Area 143,550
ft2
Annual Production 1
units
Production Hrs. Annual 4,160
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $93,132 1,912,957
kWh
Electricity Demand $27,391 4,319
kW-mo/yr
Natural Gas $95,606 6,293
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $428,246 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $29,132

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings Increase in Production Savings
01 2.7231: Use radiant heater for spot heating $300,000 $40,932 - - - - - $300,000
02 2.7231: Use radiant heater for spot heating $55,099 $39,415 - - $55,099
-
MMBtu
- - -
03 2.4226: Use / purchase optimum sized compressor $16,822 $18,000 $8,542
174,332
kWh
$8,280
-
kW-mo/yr
- - - -
04 2.4226: Use / purchase optimum sized compressor $15,355 $100,000 $4,628
94,446
kWh
$1,727
-
kW-mo/yr
- $9,000 - -
05 2.7261: Install timers and/or thermostats $12,804 $30 $10,740
219,201
kWh
$2,064
-
kW-mo/yr
- - - -
06 2.2437: Recover waste heat from equipment $8,592 $15,000 - - $8,592
-
MMBtu
- - -
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $7,396 $273 $5,126
104,624
kWh
$2,270
-
kW-mo/yr
- - - -
08 2.3131: Reschedule plant operations or reduce load to avoid peaks $1,370 - - $1,370
-
kW-mo/yr
- - - -
09 2.4323: Use optimum size and capacity equipment $1,073 $5,740 $1,073
21,906
kWh
- - - - -
10 2.4221: Install compressor air intakes in coolest locations $803 $2,400 $556
11,345
kWh
$247
-
kW-mo/yr
- - - -
11 2.7142: Utilize higher efficiency lamps and/or ballasts $5,692 $14,758 $4,088
83,432
kWh
$1,471
-
kW-mo/yr
- - $133 -
12 2.7142: Utilize higher efficiency lamps and/or ballasts $3,240 $11,654 $1,742
35,545
kWh
$1,040
-
kW-mo/yr
- - $458 -
TOTAL RECOMMENDED $428,246 $248,202 $36,495
744,831
kWh
$18,469
-
kW-mo/yr
$63,691
-
MMBtu
$9,000 $591 $300,000
TOTAL IMPLEMENTED $29,132 $26,715 $21,696
442,802
kWh
$6,845
-
kW-mo/yr
- - $591 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings Increase in Production Savings