Assessment Year | 2010 |
---|---|
Principal Product | elevator and mining parts |
NAICS | 332710: Machine Shops |
SIC | 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 121 |
Plant Area |
143,550
ft2
|
Annual Production | 1
units
|
Production Hrs. Annual | 4,160
hrs
|
Location (State) | Pennsylvania |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $93,132 | 1,912,957 |
kWh
|
$0.049 |
Electricity Demand | $27,391 | 4,319 |
kW-mo/yr
|
$6.34 |
Natural Gas | $95,606 | 6,293 |
MMBtu
|
$15.19 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $428,246 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $29,132 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings | Increase in Production Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.7231: Use radiant heater for spot heating | $300,000 | $40,932 | - | - | - | - | - | $300,000 | |
02 | 2.7231: Use radiant heater for spot heating | $55,099 | $39,415 | - | - |
$55,099
-
MMBtu
|
- | - | - | |
03 | 2.4226: Use / purchase optimum sized compressor | $16,822 | $18,000 |
$8,542
174,332
kWh
|
$8,280
-
kW-mo/yr
|
- | - | - | - | |
04 | 2.4226: Use / purchase optimum sized compressor | $15,355 | $100,000 |
$4,628
94,446
kWh
|
$1,727
-
kW-mo/yr
|
- | $9,000 | - | - | |
05 | 2.7261: Install timers and/or thermostats | $12,804 | $30 |
$10,740
219,201
kWh
|
$2,064
-
kW-mo/yr
|
- | - | - | - | |
06 | 2.2437: Recover waste heat from equipment | $8,592 | $15,000 | - | - |
$8,592
-
MMBtu
|
- | - | - | |
07 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $7,396 | $273 |
$5,126
104,624
kWh
|
$2,270
-
kW-mo/yr
|
- | - | - | - | |
08 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $1,370 | - | - |
$1,370
-
kW-mo/yr
|
- | - | - | - | |
09 | 2.4323: Use optimum size and capacity equipment | $1,073 | $5,740 |
$1,073
21,906
kWh
|
- | - | - | - | - | |
10 | 2.4221: Install compressor air intakes in coolest locations | $803 | $2,400 |
$556
11,345
kWh
|
$247
-
kW-mo/yr
|
- | - | - | - | |
11 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $5,692 | $14,758 |
$4,088
83,432
kWh
|
$1,471
-
kW-mo/yr
|
- | - | $133 | - | |
12 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,240 | $11,654 |
$1,742
35,545
kWh
|
$1,040
-
kW-mo/yr
|
- | - | $458 | - | |
TOTAL RECOMMENDED | $428,246 | $248,202 |
$36,495
744,831
kWh
|
$18,469
-
kW-mo/yr
|
$63,691
-
MMBtu
|
$9,000 | $591 | $300,000 | ||
TOTAL IMPLEMENTED | $29,132 | $26,715 |
$21,696
442,802
kWh
|
$6,845
-
kW-mo/yr
|
- | - | $591 | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings | Increase in Production Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs