ITAC Assessment: LE0303
ITAC logo
ITAC Assessment: LE0303
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2010
Principal Product secondary co-packer
NAICS 322211: Corrugated and Solid Fiber Box Manufacturing
SIC 2653: Corrugated and Solid Fiber Boxes
Sales Range $50
M
to 100
M
# of Employees 200
Plant Area 124,000
ft2
Annual Production 1,000
units
Production Hrs. Annual 4,160
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $80,178 1,120,000
kWh
Electricity Demand $27,430 3,187
kW-mo/yr
Other Gas $54,122 2,429
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $56,324 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $40,323

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Other Gas Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $26,348 $1,672 $20,029
278,206
kWh
$6,319
-
kW-mo/yr
-
02 2.7261: Install timers and/or thermostats $10,520 $650 $10,520
146,105
kWh
- -
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $4,909 $1,500 $3,781
52,511
kWh
$1,128
-
kW-mo/yr
-
04 2.4231: Reduce the pressure of compressed air to the minimum required $3,385 $2,200 $3,385
47,010
kWh
- -
05 2.7312: Minimize use of outside make-up air for ventilation except when used for economizer cycle $2,574 $7,000 $(-131.0)
(-1,820)
kWh
- $2,705
-
MMBtu
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,931 $25,900 $1,466
20,365
kWh
$465
-
kW-mo/yr
-
07 2.4323: Use optimum size and capacity equipment $1,824 $3,000 $1,824
25,329
kWh
- -
08 2.3131: Reschedule plant operations or reduce load to avoid peaks $1,378 $3,000 - $1,378
-
kW-mo/yr
-
09 2.4221: Install compressor air intakes in coolest locations $1,351 $800 $1,021
14,185
kWh
$330
-
kW-mo/yr
-
10 2.4231: Reduce the pressure of compressed air to the minimum required $1,131 $15 $1,131
15,704
kWh
- -
11 2.2437: Recover waste heat from equipment $973 $1,000 - - $973
-
MMBtu
TOTAL RECOMMENDED $56,324 $46,737 $43,026
597,595
kWh
$9,620
-
kW-mo/yr
$3,678
-
MMBtu
TOTAL IMPLEMENTED $40,323 $4,137 $32,701
454,200
kWh
$6,649
-
kW-mo/yr
$973
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Other Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs