Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Injection Molded Plastic Parts
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 50
Plant Area 25,000
ft2
Annual Production 1,000,000
lb
Production Hrs. Annual 6,240
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $89,811 1,503,224
kWh
Electricity Demand $42,460 3,886
kW-mo/yr
Natural Gas $1,830 238
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $51,237 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Administrative Changes Savings
01 2.4133: Use most efficient type of electric motors $535 $889 n/a $395
6,741
kWh
$140
-
kW-mo/yr
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $7,152 $14,840 n/a $5,043
84,408
kWh
$2,109
-
kW-mo/yr
- -
03 2.7133: Use separate switches on perimeter lighting which may be turned off when natural light is available $491 $1,250 n/a $239
4,103
kWh
$252
-
kW-mo/yr
- -
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $12,333 $51,850 n/a $9,623
161,196
kWh
$2,710
-
kW-mo/yr
- -
05 3.5314: Use in-process recycling whenever possible $726 - n/a - - $726
-
lb
-
06 4.445: Install equipment to move product $30,000 $2,773 n/a - - - $30,000
TOTAL RECOMMENDED $51,237 $71,602 $15,300
256,448
kWh
$5,211
-
kW-mo/yr
$726
-
lb
$30,000
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs