Assessment Year | 2010 |
---|---|
Principal Product | Vinyl film |
NAICS | 326113: Unlaminated Plastics Film and Sheet (except Packaging) Manufacturing |
SIC | 3083: Laminated Plastics Plate, Sheet, and Profile Shapes |
Sales Range | $10 M to 50M |
# of Employees | 154 |
Plant Area |
180,000
ft2
|
Annual Production | 21,000,000
units
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | Pennsylvania |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $737,130 | 14,397,600 |
kWh
|
$0.051 |
Electricity Demand | $264,643 | 30,770 |
kW-mo/yr
|
$8.60 |
Natural Gas | $948,636 | 103,342 |
MMBtu
|
$9.18 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $668,174 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $105,126 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | One-time Revenue or Avoided Cost Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.1224: Replace boiler | $284,580 | $500,000 | - | - |
$284,580
-
MMBtu
|
- | |
02 | 2.2449: Recover heat from exhausted steam, hot air or hot water | $185,253 | $118,000 | - | - |
$185,253
-
MMBtu
|
- | |
03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $57,617 | $13,469 |
$44,786
878,173
kWh
|
$12,831
-
kW-mo/yr
|
- | - | |
04 | 2.2692: Use outside cold water source as a supply of cooling water | $28,496 | $10,000 |
$28,496
558,742
kWh
|
- | - | - | |
05 | 2.2449: Recover heat from exhausted steam, hot air or hot water | $24,299 | $75,000 | - | - |
$24,299
-
MMBtu
|
- | |
06 | 2.2113: Repair or replace steam traps | $23,321 | $4,200 | - | - |
$23,321
-
MMBtu
|
- | |
07 | 2.2437: Recover waste heat from equipment | $12,721 | $22,000 | - | - |
$12,721
-
MMBtu
|
- | |
08 | 4.652: Replace existing equipment with more suitable substitutes | $11,375 | $100,000 |
$1,353
26,541
kWh
|
$22
-
kW-mo/yr
|
- | $10,000 | |
09 | 4.652: Replace existing equipment with more suitable substitutes | $8,386 | $8,000 |
$6,331
124,153
kWh
|
$2,055
-
kW-mo/yr
|
- | - | |
10 | 2.2437: Recover waste heat from equipment | $8,358 | $870 |
$8,358
163,888
kWh
|
- | - | - | |
11 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $7,938 | $3,000 | - |
$7,938
-
kW-mo/yr
|
- | - | |
12 | 2.4221: Install compressor air intakes in coolest locations | $6,001 | $4,500 |
$4,917
96,419
kWh
|
$1,084
-
kW-mo/yr
|
- | - | |
13 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $4,550 | $2,440 |
$3,432
67,371
kWh
|
$1,118
-
kW-mo/yr
|
- | - | |
14 | 2.1233: Analyze flue gas for proper air/fuel ratio | $4,029 | $20,000 | - | - |
$4,029
-
MMBtu
|
- | |
15 | 2.7135: Install occupancy sensors | $1,097 | $2,035 |
$1,097
21,504
kWh
|
- | - | - | |
16 | 2.7261: Install timers and/or thermostats | $153 | $1,000 | - | - |
$153
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $668,174 | $884,514 |
$98,770
1,936,791
kWh
|
$25,048
-
kW-mo/yr
|
$534,356
-
MMBtu
|
$10,000 | ||
TOTAL IMPLEMENTED | $105,126 | $48,514 |
$62,590
1,227,355
kWh
|
$15,033
-
kW-mo/yr
|
$27,503
-
MMBtu
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | One-time Revenue or Avoided Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs