ITAC Assessment: LE0301
ITAC logo
ITAC Assessment: LE0301
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2010
Principal Product Vinyl film
NAICS 326113: Unlaminated Plastics Film and Sheet (except Packaging) Manufacturing
SIC 3083: Laminated Plastics Plate, Sheet, and Profile Shapes
Sales Range $10
M
to 50
M
# of Employees 154
Plant Area 180,000
ft2
Annual Production 21,000,000
units
Production Hrs. Annual 6,000
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $737,130 14,397,600
kWh
Electricity Demand $264,643 30,770
kW-mo/yr
Natural Gas $948,636 103,342
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $668,174 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $105,126

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
01 2.1224: Replace boiler $284,580 $500,000 - - $284,580
-
MMBtu
-
02 2.2449: Recover heat from exhausted steam, hot air or hot water $185,253 $118,000 - - $185,253
-
MMBtu
-
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $57,617 $13,469 $44,786
878,173
kWh
$12,831
-
kW-mo/yr
- -
04 2.2692: Use outside cold water source as a supply of cooling water $28,496 $10,000 $28,496
558,742
kWh
- - -
05 2.2449: Recover heat from exhausted steam, hot air or hot water $24,299 $75,000 - - $24,299
-
MMBtu
-
06 2.2113: Repair or replace steam traps $23,321 $4,200 - - $23,321
-
MMBtu
-
07 2.2437: Recover waste heat from equipment $12,721 $22,000 - - $12,721
-
MMBtu
-
08 4.652: Replace existing equipment with more suitable substitutes $11,375 $100,000 $1,353
26,541
kWh
$22
-
kW-mo/yr
- $10,000
09 4.652: Replace existing equipment with more suitable substitutes $8,386 $8,000 $6,331
124,153
kWh
$2,055
-
kW-mo/yr
- -
10 2.2437: Recover waste heat from equipment $8,358 $870 $8,358
163,888
kWh
- - -
11 2.3131: Reschedule plant operations or reduce load to avoid peaks $7,938 $3,000 - $7,938
-
kW-mo/yr
- -
12 2.4221: Install compressor air intakes in coolest locations $6,001 $4,500 $4,917
96,419
kWh
$1,084
-
kW-mo/yr
- -
13 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,550 $2,440 $3,432
67,371
kWh
$1,118
-
kW-mo/yr
- -
14 2.1233: Analyze flue gas for proper air/fuel ratio $4,029 $20,000 - - $4,029
-
MMBtu
-
15 2.7135: Install occupancy sensors $1,097 $2,035 $1,097
21,504
kWh
- - -
16 2.7261: Install timers and/or thermostats $153 $1,000 - - $153
-
MMBtu
-
TOTAL RECOMMENDED $668,174 $884,514 $98,770
1,936,791
kWh
$25,048
-
kW-mo/yr
$534,356
-
MMBtu
$10,000
TOTAL IMPLEMENTED $105,126 $48,514 $62,590
1,227,355
kWh
$15,033
-
kW-mo/yr
$27,503
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs