ITAC Assessment: LE0297
ITAC logo
ITAC Assessment: LE0297
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2010
Principal Product metering motors
NAICS 333911: Pump and Pumping Equipment Manufacturing
SIC 3561: Pumps and Pumping Equipment
Sales Range $100
M
to 500
M
# of Employees 212
Plant Area 100,000
ft2
Annual Production 21,000
units
Production Hrs. Annual 4,680
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $183,718 2,641,958
kWh
Electricity Demand $98,032 6,937
kW-mo/yr
Natural Gas $23,662 1,112
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $52,091 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $15,904

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Ancillary Material Cost Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $9,029 $785 $5,946
84,946
kWh
$3,083
-
kW-mo/yr
- -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $6,875 $1,760 $4,530
64,720
kWh
$2,345
-
kW-mo/yr
- -
03 2.3131: Reschedule plant operations or reduce load to avoid peaks $4,903 $3,000 - $4,903
-
kW-mo/yr
- -
04 2.7232: Replace existing hvac unit with high efficiency model $4,627 $66,360 $2,057
29,340
kWh
$1,151
-
kW-mo/yr
$1,419
-
MMBtu
-
05 2.7261: Install timers and/or thermostats $2,326 $450 $2,326
33,230
kWh
- - -
06 2.7312: Minimize use of outside make-up air for ventilation except when used for economizer cycle $2,367 $4,500 - - $2,367
-
MMBtu
-
07 2.2437: Recover waste heat from equipment $2,239 $1,000 $2,239
31,986
kWh
- - -
08 2.4221: Install compressor air intakes in coolest locations $935 $800 $652
9,319
kWh
$283
-
kW-mo/yr
- -
09 2.7142: Utilize higher efficiency lamps and/or ballasts $17,807 $55,184 $11,409
162,984
kWh
$5,786
-
kW-mo/yr
- $612
10 2.7135: Install occupancy sensors $983 $450 $983
14,040
kWh
- - -
TOTAL RECOMMENDED $52,091 $134,289 $30,142
430,565
kWh
$17,551
-
kW-mo/yr
$3,786
-
MMBtu
$612
TOTAL IMPLEMENTED $15,904 $2,545 $10,476
149,666
kWh
$5,428
-
kW-mo/yr
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Ancillary Material Cost Savings