ITAC Assessment: LE0287
ITAC logo
ITAC Assessment: LE0287
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2009
Principal Product closures cores and containers
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 215
Plant Area 250,000
ft2
Annual Production 100,000,000
units
Production Hrs. Annual 6,240
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,358,228 18,092,630
kWh
Electricity Demand $246,734 37,030
kW-mo/yr
Natural Gas $24,993 19,814
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $566,268 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,058

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4226: Use / purchase optimum sized compressor $184,606 $250,000 $137,606
1,834,746
kWh
$47,000
-
kW-mo/yr
-
02 2.7261: Install timers and/or thermostats $220,823 $50,000 $220,823
2,010,978
kWh
- -
03 2.4221: Install compressor air intakes in coolest locations $79,515 $8,000 $67,807
904,090
kWh
$11,708
-
kW-mo/yr
-
04 2.7261: Install timers and/or thermostats $36,003 $650 $32,760
447,573
kWh
- $3,243
-
MMBtu
05 2.4226: Use / purchase optimum sized compressor $19,644 $17,000 $19,644
261,925
kWh
- -
06 2.1131: Repair faulty insulation in furnaces, boilers, etc $13,621 $7,167 $11,636
155,148
kWh
$1,985
-
kW-mo/yr
-
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,058 $1,840 $3,465
46,217
kWh
$593
-
kW-mo/yr
-
08 2.7142: Utilize higher efficiency lamps and/or ballasts $7,998 $27,281 $6,819
92,190
kWh
$1,179
-
kW-mo/yr
-
TOTAL RECOMMENDED $566,268 $361,938 $500,560
5,752,867
kWh
$62,465
-
kW-mo/yr
$3,243
-
MMBtu
TOTAL IMPLEMENTED $4,058 $1,840 $3,465
46,217
kWh
$593
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs