ITAC Assessment: OK0227
ITAC logo
ITAC Assessment: OK0227
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1987
Principal Product CENTRAL VACUUM SYSTEMS
NAICS
n/a
SIC 3589: Service Industry Machinery, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 60
Plant Area
n/a
Annual Production 22,500
pieces
Production Hrs. Annual 4,992
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $40,132 570,926
kWh
Natural Gas $25,339 6,290
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $8,522 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,734

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.7221: Lower temperature during the winter season and vice-versa $6,433 $3,500 - $6,433
-
MMBtu
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $520 $120 $520
6,448
kWh
- -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $268 - $318
5,569
kWh
- $(-50.0)
04 2.2511: Insulate bare equipment $626 $216 $626
11,137
kWh
- -
05 2.2511: Insulate bare equipment $162 $400 - $162
-
MMBtu
-
06 2.2437: Recover waste heat from equipment $513 $305 $513
25,498
kWh
- -
TOTAL RECOMMENDED $8,522 $4,541 $1,977
48,652
kWh
$6,595
-
MMBtu
$(-50.0)
TOTAL IMPLEMENTED $7,734 $3,925 $1,351
37,515
kWh
$6,433
-
MMBtu
$(-50.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs