ITAC Assessment: LE0285
ITAC logo
ITAC Assessment: LE0285
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2009
Principal Product Park and Recreation equipments
NAICS 339920: Sporting and Athletic Goods Manufacturing
SIC 3949: Sporting and Athletic Goods, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 290
Plant Area 250,000
ft2
Annual Production 1,000,000
units
Production Hrs. Annual 2,295
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $570,714 5,947,200
kWh
Electricity Demand $70,779 16,233
kW-mo/yr
Natural Gas $243,991 19,814
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $191,974 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,780

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 3.2124: Convert to air assisted / airless paint guns $146,916 $900,000 - - $146,916
-
MMBtu
02 2.2437: Recover waste heat from equipment $12,507 $5,000 - - $12,507
-
MMBtu
03 2.4231: Reduce the pressure of compressed air to the minimum required $10,666 $200 $8,612
89,717
kWh
$2,054
-
kW-mo/yr
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $9,646 $2,000 $7,784
81,194
kWh
$1,862
-
kW-mo/yr
-
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $5,999 $12,000 $4,848
50,497
kWh
$1,151
-
kW-mo/yr
-
06 2.4221: Install compressor air intakes in coolest locations $2,792 $800 $2,256
23,499
kWh
$536
-
kW-mo/yr
-
07 2.7261: Install timers and/or thermostats $1,391 $50 - - $1,391
-
MMBtu
08 2.7135: Install occupancy sensors $1,389 $1,525 $1,389
14,472
kWh
- -
09 2.7312: Minimize use of outside make-up air for ventilation except when used for economizer cycle $668 $900 - - $668
-
MMBtu
TOTAL RECOMMENDED $191,974 $922,475 $24,889
259,379
kWh
$5,603
-
kW-mo/yr
$161,482
-
MMBtu
TOTAL IMPLEMENTED $2,780 $1,575 $1,389
14,472
kWh
- $1,391
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs