| Assessment Year | 2005 |
|---|---|
| Principal Product | aerospace products |
| NAICS | 336413: Other Aircraft Parts and Auxiliary Equipment Manufacturing |
| SIC | 3728: Aircraft Parts and Auxiliary Equipment, Not Elsewhere Classified |
| Sales Range | $50 M to 100M |
| # of Employees | 475 |
| Plant Area |
240,000
ft2
|
| Annual Production | 4,000
pieces
|
| Production Hrs. Annual | 6,000
hrs
|
| Location (State) | Utah |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $239,148 | 8,622,000 |
kWh
|
$0.028 |
| Electricity Demand | $164,880 | 17,466 |
kW-mo/yr
|
$9.44 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $48,965 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.7491: Insulate glazing, walls, ceilings, and roofs | $8,056 | $12,620 |
$5,578
201,700
kWh
|
$2,478
-
kW-mo/yr
|
- | - | |
| 02 | 2.4239: Eliminate or reduce compressed air usage | $3,984 | $6,400 |
$2,132
77,100
kWh
|
$1,852
-
kW-mo/yr
|
- | - | |
| 03 | 2.3191: Use demand controller or load shedder | $17,445 | $3,600 |
$9,170
331,700
kWh
|
$8,275
-
kW-mo/yr
|
- | - | |
| 04 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $3,447 | $21,000 |
$3,858
139,500
kWh
|
$3,356
-
kW-mo/yr
|
- |
$(-3,767.0)
-
MMBtu
|
|
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $773 | $4,320 |
$412
14,900
kWh
|
$361
-
kW-mo/yr
|
- | - | |
| 06 | 2.3212: Optimize plant power factor | $15,260 | $14,000 | - | - | $15,260 | - | |
| TOTAL RECOMMENDED | $48,965 | $61,940 |
$21,150
764,900
kWh
|
$16,322
-
kW-mo/yr
|
$15,260 |
$(-3,767.0)
-
MMBtu
|
||
| TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs