ITAC Assessment: UU0086
ITAC logo
ITAC Assessment: UU0086
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product aerospace products
NAICS 336413: Other Aircraft Parts and Auxiliary Equipment Manufacturing
SIC 3728: Aircraft Parts and Auxiliary Equipment, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 475
Plant Area 240,000
ft2
Annual Production 4,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) Utah

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $239,148 8,622,000
kWh
Electricity Demand $164,880 17,466
kW-mo/yr
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $48,965 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.7491: Insulate glazing, walls, ceilings, and roofs $8,056 $12,620 $5,578
201,700
kWh
$2,478
-
kW-mo/yr
- -
02 2.4239: Eliminate or reduce compressed air usage $3,984 $6,400 $2,132
77,100
kWh
$1,852
-
kW-mo/yr
- -
03 2.3191: Use demand controller or load shedder $17,445 $3,600 $9,170
331,700
kWh
$8,275
-
kW-mo/yr
- -
04 2.1311: Replace electrically-operated equipment with fossil fuel equipment $3,447 $21,000 $3,858
139,500
kWh
$3,356
-
kW-mo/yr
- $(-3,767.0)
-
MMBtu
05 2.7142: Utilize higher efficiency lamps and/or ballasts $773 $4,320 $412
14,900
kWh
$361
-
kW-mo/yr
- -
06 2.3212: Optimize plant power factor $15,260 $14,000 - - $15,260 -
TOTAL RECOMMENDED $48,965 $61,940 $21,150
764,900
kWh
$16,322
-
kW-mo/yr
$15,260 $(-3,767.0)
-
MMBtu
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs