Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2008
Principal Product Aluminum Wire, Cable
NAICS 331318: Other Aluminum Rolling, Drawing, and Extruding
SIC 3357: Drawing and Insulating of Nonferrous Wire
Sales Range greater than $500
M
# of Employees 212
Plant Area 400,000
ft2
Annual Production 106,000,000
lb
Production Hrs. Annual 8,568
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,003,535 18,788,000
kWh
Electricity Demand $225,637 35,575
kW-mo/yr
Natural Gas $378,113 40,725
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $234,422 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $110,469

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings LPG Savings Administrative Changes Savings Ancillary Material Cost Savings One-time Revenue or Avoided Cost Savings
01 2.3311: Replace dc equipment with ac equipment $94,198 $45,000 $69,138
1,304,476
kWh
$4,220
-
kW-mo/yr
- - $10,000 $10,840 -
02 2.7261: Install timers and/or thermostats $35,042 $875 $23,294
439,518
kWh
- $11,748
-
MMBtu
- - - -
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $27,263 $40,000 $22,280
420,382
kWh
$4,983
-
kW-mo/yr
- - - - -
04 2.7231: Use radiant heater for spot heating $17,604 $3,900 - - - $17,604
-
MMBtu
- - -
05 2.2442: Preheat combustion air with waste heat $14,909 $30,000 - - $14,909
-
MMBtu
- - - -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $13,337 $3,000 $11,359
214,323
kWh
$1,978
-
kW-mo/yr
- - - - -
07 2.2437: Recover waste heat from equipment $6,931 $1,000 - - $6,931
-
MMBtu
- - - -
08 2.1131: Repair faulty insulation in furnaces, boilers, etc $5,095 $7,278 - - $5,095
-
MMBtu
- - - -
09 2.4221: Install compressor air intakes in coolest locations $2,934 $1,000 $1,907
35,983
kWh
$1,027
-
kW-mo/yr
- - - - -
10 2.4231: Reduce the pressure of compressed air to the minimum required $1,865 $150 $1,586
29,926
kWh
$279
-
kW-mo/yr
- - - - -
11 2.4111: Utilize energy-efficient belts and other improved mechanisms $804 $500 $703
13,265
kWh
$101
-
kW-mo/yr
- - - - -
12 2.7111: Reduce illumination to minimum necessary levels $704 $255 $637
12,012
kWh
$57
-
kW-mo/yr
- - - - $10
13 2.7142: Utilize higher efficiency lamps and/or ballasts $13,736 $54,562 $11,483
216,667
kWh
$2,003
-
kW-mo/yr
- - - - $250
TOTAL RECOMMENDED $234,422 $187,520 $142,387
2,686,552
kWh
$14,648
-
kW-mo/yr
$38,683
-
MMBtu
$17,604
-
MMBtu
$10,000 $10,840 $260
TOTAL IMPLEMENTED $110,469 $49,000 $82,404
1,554,782
kWh
$7,225
-
kW-mo/yr
- - $10,000 $10,840 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings LPG Savings Administrative Changes Savings Ancillary Material Cost Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs