Assessment Year | 2008 |
---|---|
Principal Product | flexible packaging |
NAICS | 323111: Commercial Printing (except Screen and Books) |
SIC | 2759: Commercial Printing, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 121 |
Plant Area |
65,000
ft2
|
Annual Production | 500,000,000
units
|
Production Hrs. Annual | 8,736
hrs
|
Location (State) | Pennsylvania |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $264,450 | 4,946,939 |
kWh
|
$0.053 |
Electricity Demand | $114,586 | 8,072 |
kW-mo/yr
|
$14.20 |
Natural Gas | $239,502 | 25,873 |
MMBtu
|
$9.26 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $276,338 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $217,332 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings | Increase in Production Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.1336: Install equipment to utilize waste fuel | $112,626 | $500,000 |
$11,744
221,580
kWh
|
$5,085
-
kW-mo/yr
|
$95,797
-
MMBtu
|
- | - | |
02 | 4.652: Replace existing equipment with more suitable substitutes | $77,672 | $600,000 |
$28,857
544,481
kWh
|
$9,968
-
kW-mo/yr
|
- | $10,000 | $28,847 | |
03 | 2.7447: Install vinyl strip / high speed / air curtain doors | $27,087 | $9,000 | - | - |
$27,087
-
MMBtu
|
- | - | |
04 | 2.7261: Install timers and/or thermostats | $14,712 | $250 |
$10,591
199,824
kWh
|
- |
$4,121
-
MMBtu
|
- | - | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $8,284 | $3,500 |
$8,284
156,303
kWh
|
- | - | - | - | |
06 | 2.7135: Install occupancy sensors | $6,589 | $720 |
$6,589
124,331
kWh
|
- | - | - | - | |
07 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $5,734 | $3,000 | - |
$5,734
-
kW-mo/yr
|
- | - | - | |
08 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $4,038 | $900 |
$2,866
54,082
kWh
|
$1,172
-
kW-mo/yr
|
- | - | - | |
09 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $19,596 | $36,313 |
$14,324
270,266
kWh
|
$5,272
-
kW-mo/yr
|
- | - | - | |
TOTAL RECOMMENDED | $276,338 | $1,153,683 |
$83,255
1,570,867
kWh
|
$27,231
-
kW-mo/yr
|
$127,005
-
MMBtu
|
$10,000 | $28,847 | ||
TOTAL IMPLEMENTED | $217,332 | $1,104,650 |
$62,342
1,176,270
kWh
|
$16,225
-
kW-mo/yr
|
$99,918
-
MMBtu
|
$10,000 | $28,847 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings | Increase in Production Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs