Assessment Year | 2008 |
---|---|
Principal Product | Waste Oil Furnaces |
NAICS | 333415: Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipmen |
SIC | 3585: Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipment |
Sales Range | $10 M to 50M |
# of Employees | 110 |
Plant Area |
110,000
ft2
|
Annual Production | 5,500
units
|
Production Hrs. Annual | 4,420
hrs
|
Location (State) | Pennsylvania |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $119,745 | 1,910,400 |
kWh
|
$0.063 |
Electricity Demand | $49,108 | 5,617 |
kW-mo/yr
|
$8.74 |
Natural Gas | $23,262 | 5,786 |
MMBtu
|
$4.02 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $96,002 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $67,026 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | By-product Production Savings |
---|---|---|---|---|---|---|---|---|
01 | 4.422: Utilize outside contracting | $45,000 | $7,800 | - | - | - | $45,000 | |
02 | 2.7261: Install timers and/or thermostats | $10,266 | $2,250 |
$10,266
162,949
kWh
|
- | - | - | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $7,608 | $860 |
$4,456
70,562
kWh
|
$3,152
-
kW-mo/yr
|
- | - | |
04 | 2.7233: Use properly designed and sized hvac equipment | $5,367 | $46 |
$5,367
85,197
kWh
|
- | - | - | |
05 | 2.4226: Use / purchase optimum sized compressor | $3,558 | - |
$822
13,055
kWh
|
$2,736
-
kW-mo/yr
|
- | - | |
06 | 2.7496: Install partitions to reduce size of conditioned space | $594 | - |
$265
4,206
kWh
|
$192
-
kW-mo/yr
|
$137
-
MMBtu
|
- | |
07 | 2.4231: Reduce the pressure of compressed air to the minimum required | $623 | $200 |
$448
7,113
kWh
|
$175
-
kW-mo/yr
|
- | - | |
08 | 2.7312: Minimize use of outside make-up air for ventilation except when used for economizer cycle | $429 | $600 | - | - |
$429
-
MMBtu
|
- | |
09 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $22,557 | $58,273 |
$13,179
209,196
kWh
|
$9,378
-
kW-mo/yr
|
- | - | |
TOTAL RECOMMENDED | $96,002 | $70,029 |
$34,803
552,278
kWh
|
$15,633
-
kW-mo/yr
|
$566
-
MMBtu
|
$45,000 | ||
TOTAL IMPLEMENTED | $67,026 | $10,910 |
$15,809
250,772
kWh
|
$6,080
-
kW-mo/yr
|
$137
-
MMBtu
|
$45,000 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | By-product Production Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs