ITAC Assessment: LE0265
ITAC logo
ITAC Assessment: LE0265
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2008
Principal Product Waste Oil Furnaces
NAICS 333415: Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipmen
SIC 3585: Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipment
Sales Range $10
M
to 50
M
# of Employees 110
Plant Area 110,000
ft2
Annual Production 5,500
units
Production Hrs. Annual 4,420
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $119,745 1,910,400
kWh
Electricity Demand $49,108 5,617
kW-mo/yr
Natural Gas $23,262 5,786
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $96,002 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $67,026

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings By-product Production Savings
01 4.422: Utilize outside contracting $45,000 $7,800 - - - $45,000
02 2.7261: Install timers and/or thermostats $10,266 $2,250 $10,266
162,949
kWh
- - -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $7,608 $860 $4,456
70,562
kWh
$3,152
-
kW-mo/yr
- -
04 2.7233: Use properly designed and sized hvac equipment $5,367 $46 $5,367
85,197
kWh
- - -
05 2.4226: Use / purchase optimum sized compressor $3,558 - $822
13,055
kWh
$2,736
-
kW-mo/yr
- -
06 2.7496: Install partitions to reduce size of conditioned space $594 - $265
4,206
kWh
$192
-
kW-mo/yr
$137
-
MMBtu
-
07 2.4231: Reduce the pressure of compressed air to the minimum required $623 $200 $448
7,113
kWh
$175
-
kW-mo/yr
- -
08 2.7312: Minimize use of outside make-up air for ventilation except when used for economizer cycle $429 $600 - - $429
-
MMBtu
-
09 2.7142: Utilize higher efficiency lamps and/or ballasts $22,557 $58,273 $13,179
209,196
kWh
$9,378
-
kW-mo/yr
- -
TOTAL RECOMMENDED $96,002 $70,029 $34,803
552,278
kWh
$15,633
-
kW-mo/yr
$566
-
MMBtu
$45,000
TOTAL IMPLEMENTED $67,026 $10,910 $15,809
250,772
kWh
$6,080
-
kW-mo/yr
$137
-
MMBtu
$45,000
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings By-product Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs