ITAC Assessment: OK0794
ITAC logo
ITAC Assessment: OK0794
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2010
Principal Product Hydraulic Cylinder
NAICS 333995: Fluid Power Cylinder and Actuator Manufacturing
SIC 3593: Fluid Power Cylinders and Actuators
Sales Range $5
M
to 10
M
# of Employees 87
Plant Area 132,500
ft2
Annual Production 92,000
pieces
Production Hrs. Annual 4,355
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $137,339 1,917,600
kWh
Electricity Demand $40,301 8,699
kW-mo/yr
Natural Gas $61,884 9,482
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $38,855 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $13,532

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7221: Lower temperature during the winter season and vice-versa $12,132 $75,405 - $12,132
-
MMBtu
02 2.6232: Install set-back timers $2,786 $3,239 - $2,786
-
MMBtu
03 2.7492: Use proper thickness of insulation on building envelope $10,317 $159,840 - $10,317
-
MMBtu
04 2.7142: Utilize higher efficiency lamps and/or ballasts $3,034 $12,733 $3,034
42,373
kWh
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $7,300 $68,625 $7,300
101,962
kWh
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $853 $4,978 $853
11,919
kWh
-
07 2.2437: Recover waste heat from equipment $653 $3,006 - $653
-
MMBtu
08 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,400 $841 $1,400
19,564
kWh
-
09 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $380 $2,280 $380
5,318
kWh
-
TOTAL RECOMMENDED $38,855 $330,947 $12,967
181,136
kWh
$25,888
-
MMBtu
TOTAL IMPLEMENTED $13,532 $76,246 $1,400
19,564
kWh
$12,132
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs