ITAC Assessment: CO0425
ITAC logo
ITAC Assessment: CO0425
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product directories and catalogs
NAICS
n/a
SIC 2741: Miscellaneous Publishing
Sales Range $10
M
to 50
M
# of Employees 220
Plant Area 150,000
ft2
Annual Production 26,000,000
pieces
Production Hrs. Annual 8,760
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $284,159 10,378,957
kWh
Electricity Demand $155,821 19,966
kW-mo/yr
Electricity Fees $420 -
Natural Gas $15,130 3,462
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $30,767 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $17,568

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Other Liquid (haz) Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $11,899 $32,885 $8,397
313,599
kWh
$3,502
-
kW-mo/yr
- - - -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,760 $370 $1,980
73,857
kWh
$780
-
kW-mo/yr
- - - -
03 2.4133: Use most efficient type of electric motors $308 $602 $224
8,206
kWh
$84
-
kW-mo/yr
- - - -
04 2.8113: Purchase gas directly from a contract gas supplier $1,120 $450 - - - - $1,120 -
05 2.7132: Install timers on light switches in little used areas $310 $150 $310
11,430
kWh
- - - - -
06 2.7229: Air condition only space necessary $180 $190 $100
3,810
kWh
$80
-
kW-mo/yr
- - - -
07 3.4155: Meter waste water $6,350 $1,040 - - $6,350
-
Tgal
- - -
08 3.8132: Use less toxic and volatile solvent substitutes $5,100 - - - - - - $5,100
09 3.8132: Use less toxic and volatile solvent substitutes $2,740 $6,000 $(-700.0)
(-26,377)
kWh
$(-280.0)
-
kW-mo/yr
- $5,640
-
gal
- $(-1,920.0)
TOTAL RECOMMENDED $30,767 $41,687 $10,311
384,525
kWh
$4,166
-
kW-mo/yr
$6,350
-
Tgal
$5,640
-
gal
$1,120 $3,180
TOTAL IMPLEMENTED $17,568 $8,162 $1,814
67,116
kWh
$584
-
kW-mo/yr
$6,350
-
Tgal
$5,640
-
gal
- $3,180
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Other Liquid (haz) Savings Administrative Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs