Assessment Year | 2007 |
---|---|
Principal Product | corrugated packaging and displays |
NAICS | 322211: Corrugated and Solid Fiber Box Manufacturing |
SIC | 2653: Corrugated and Solid Fiber Boxes |
Sales Range | $10 M to 50M |
# of Employees | 205 |
Plant Area |
198,500
ft2
|
Annual Production | 45,000
ton
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | Pennsylvania |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $245,274 | 5,440,762 |
kWh
|
$0.045 |
Electricity Demand | $130,887 | 13,705 |
kW-mo/yr
|
$9.55 |
Natural Gas | $882,539 | 56,123 |
MMBtu
|
$15.73 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $549,400 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $486,319 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Increase in Production Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.8113: Purchase gas directly from a contract gas supplier | $433,831 | $500 | - | - |
$433,831
-
MMBtu
|
- | |
02 | 4.424: Improve space comfort conditioning | $44,000 | $3,000 | - | - | - | $44,000 | |
03 | 2.2113: Repair or replace steam traps | $23,595 | $5,000 | - | - |
$23,595
-
MMBtu
|
- | |
04 | 2.1233: Analyze flue gas for proper air/fuel ratio | $19,641 | $29,600 | - | - |
$19,641
-
MMBtu
|
- | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $9,252 | $1,000 |
$6,495
144,330
kWh
|
$2,757
-
kW-mo/yr
|
- | - | |
06 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $9,146 | $21,000 | - |
$9,146
-
kW-mo/yr
|
- | - | |
07 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $4,471 | $1,500 |
$3,038
67,535
kWh
|
$1,433
-
kW-mo/yr
|
- | - | |
08 | 2.7261: Install timers and/or thermostats | $3,186 | $420 |
$1,495
33,210
kWh
|
$1,691
-
kW-mo/yr
|
- | - | |
09 | 2.4221: Install compressor air intakes in coolest locations | $2,278 | $2,500 |
$1,333
29,648
kWh
|
$945
-
kW-mo/yr
|
- | - | |
TOTAL RECOMMENDED | $549,400 | $64,520 |
$12,361
274,723
kWh
|
$15,972
-
kW-mo/yr
|
$477,067
-
MMBtu
|
$44,000 | ||
TOTAL IMPLEMENTED | $486,319 | $36,100 |
$6,495
144,330
kWh
|
$2,757
-
kW-mo/yr
|
$477,067
-
MMBtu
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Increase in Production Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs