Assessment Year | 2006 |
---|---|
Principal Product | Boxed Chocolates |
NAICS | 311352: Confectionery Manufacturing from Purchased Chocolate |
SIC | 2064: Candy and Other Confectionery Products |
Sales Range | $50 M to 100M |
# of Employees | 160 |
Plant Area |
108,000
ft2
|
Annual Production | 5,014,500
lb
|
Production Hrs. Annual | 4,160
hrs
|
Location (State) | Pennsylvania |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $261,577 | 4,745,700 |
kWh
|
$0.055 |
Electricity Demand | $68,328 | 10,183 |
kW-mo/yr
|
$6.71 |
Natural Gas | $140,516 | 12,097 |
MMBtu
|
$11.62 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $94,004 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $12,846 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Increase in Production Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.2515: Use optimum thickness insulation | $44,800 | $14,036 | - | - | - | $44,800 | |
02 | 2.2511: Insulate bare equipment | $19,283 | $17,728 | - | - |
$19,283
-
MMBtu
|
- | |
03 | 2.7261: Install timers and/or thermostats | $8,534 | $2,100 | - | - |
$8,534
-
MMBtu
|
- | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $6,332 | $800 |
$4,683
85,153
kWh
|
$1,649
-
kW-mo/yr
|
- | - | |
05 | 2.4226: Use / purchase optimum sized compressor | $2,990 | $3,000 |
$2,151
39,085
kWh
|
$839
-
kW-mo/yr
|
- | - | |
06 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $3,416 | $2,500 | - |
$3,416
-
kW-mo/yr
|
- | - | |
07 | 2.2511: Insulate bare equipment | $881 | $197 | - | - |
$881
-
MMBtu
|
- | |
08 | 2.4221: Install compressor air intakes in coolest locations | $789 | $1,000 |
$536
9,736
kWh
|
$253
-
kW-mo/yr
|
- | - | |
09 | 2.7135: Install occupancy sensors | $465 | $375 |
$465
8,326
kWh
|
- | - | - | |
10 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $6,514 | $12,000 |
$4,817
87,610
kWh
|
$1,697
-
kW-mo/yr
|
- | - | |
TOTAL RECOMMENDED | $94,004 | $53,736 |
$12,652
229,910
kWh
|
$7,854
-
kW-mo/yr
|
$28,698
-
MMBtu
|
$44,800 | ||
TOTAL IMPLEMENTED | $12,846 | $12,800 |
$9,500
172,763
kWh
|
$3,346
-
kW-mo/yr
|
- | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Increase in Production Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs