Assessment Year | 2006 |
---|---|
Principal Product | Electronic components |
NAICS | 334416: Capacitor, Resistor, Coil, Transformer, and Other Inductor Manufacturing |
SIC | 3675: Electronic Capacitors |
Sales Range | $10 M to 50M |
# of Employees | 96 |
Plant Area |
50,000
ft2
|
Annual Production | 0
units
|
Production Hrs. Annual | 6,120
hrs
|
Location (State) | New Jersey |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $227,565 | 2,536,292 |
kWh
|
$0.090 |
Electricity Demand | $48,682 | 8,790 |
kW-mo/yr
|
$5.54 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $34,435 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $13,189 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings |
---|---|---|---|---|---|---|---|
01 | 2.7232: Replace existing hvac unit with high efficiency model | $15,075 | $41,200 |
$12,038
133,760
kWh
|
$3,037
-
kW-mo/yr
|
- | |
02 | 2.3134: Shift from daytime to nighttime operation | $4,308 | $620 | - |
$4,308
-
kW-mo/yr
|
- | |
03 | 2.7261: Install timers and/or thermostats | $3,963 | $1,250 |
$3,963
44,158
kWh
|
- | - | |
04 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $2,427 | $2,500 | - |
$2,427
-
kW-mo/yr
|
- | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,503 | $100 |
$1,104
12,264
kWh
|
$399
-
kW-mo/yr
|
- | |
06 | 2.4231: Reduce the pressure of compressed air to the minimum required | $988 | $1,700 |
$616
6,846
kWh
|
$372
-
kW-mo/yr
|
- | |
07 | 2.4221: Install compressor air intakes in coolest locations | $315 | $750 |
$210
2,328
kWh
|
$105
-
kW-mo/yr
|
- | |
08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $5,856 | $43,904 |
$4,379
48,654
kWh
|
$529
-
kW-mo/yr
|
$948 | |
TOTAL RECOMMENDED | $34,435 | $92,024 |
$22,310
248,010
kWh
|
$11,177
-
kW-mo/yr
|
$948 | ||
TOTAL IMPLEMENTED | $13,189 | $6,170 |
$5,683
63,268
kWh
|
$7,506
-
kW-mo/yr
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs