| Assessment Year | 2004 |
|---|---|
| Principal Product | Upholestered Furniture |
| NAICS | 337121: Upholstered Household Furniture Manufacturing |
| SIC | 2512: Wood Household Furniture, Upholstered |
| Sales Range | $10 M to 50M |
| # of Employees | 176 |
| Plant Area |
160,000
ft2
|
| Annual Production | 49,000
pieces
|
| Production Hrs. Annual | 2,000
hrs
|
| Location (State) | Pennsylvania |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $65,213 | 1,031,040 |
kWh
|
$0.063 |
| Electricity Demand | $27,524 | 3,966 |
kW-mo/yr
|
$6.94 |
| Natural Gas | $80,639 | 7,588 |
MMBtu
|
$10.63 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $30,534 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $6,294 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.1321: Replace fossil fuel equipment with electrical equipment | $24,240 | $29,000 | - | - |
$24,240
-
MMBtu
|
|
| 02 | 2.7447: Install vinyl strip / high speed / air curtain doors | $3,420 | $13,640 | - | - |
$3,420
-
MMBtu
|
|
| 03 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $1,378 | $2,500 | - |
$1,378
-
kW-mo/yr
|
- | |
| 04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $879 | - |
$580
9,211
kWh
|
$299
-
kW-mo/yr
|
- | |
| 05 | 2.4221: Install compressor air intakes in coolest locations | $397 | $500 |
$244
3,880
kWh
|
$153
-
kW-mo/yr
|
- | |
| 06 | 2.6218: Turn off equipment when not in use | $220 | - |
$220
3,497
kWh
|
- | - | |
| TOTAL RECOMMENDED | $30,534 | $45,640 |
$1,044
16,588
kWh
|
$1,830
-
kW-mo/yr
|
$27,660
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $6,294 | $16,640 |
$1,044
16,588
kWh
|
$1,830
-
kW-mo/yr
|
$3,420
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs