ITAC Assessment: LE0202
ITAC logo
ITAC Assessment: LE0202
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Upholestered Furniture
NAICS 337121: Upholstered Household Furniture Manufacturing
SIC 2512: Wood Household Furniture, Upholstered
Sales Range $10
M
to 50
M
# of Employees 176
Plant Area 160,000
ft2
Annual Production 49,000
pieces
Production Hrs. Annual 2,000
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $65,213 1,031,040
kWh
Electricity Demand $27,524 3,966
kW-mo/yr
Natural Gas $80,639 7,588
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $30,534 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,294

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.1321: Replace fossil fuel equipment with electrical equipment $24,240 $29,000 - - $24,240
-
MMBtu
02 2.7447: Install vinyl strip / high speed / air curtain doors $3,420 $13,640 - - $3,420
-
MMBtu
03 2.3131: Reschedule plant operations or reduce load to avoid peaks $1,378 $2,500 - $1,378
-
kW-mo/yr
-
04 2.4231: Reduce the pressure of compressed air to the minimum required $879 - $580
9,211
kWh
$299
-
kW-mo/yr
-
05 2.4221: Install compressor air intakes in coolest locations $397 $500 $244
3,880
kWh
$153
-
kW-mo/yr
-
06 2.6218: Turn off equipment when not in use $220 - $220
3,497
kWh
- -
TOTAL RECOMMENDED $30,534 $45,640 $1,044
16,588
kWh
$1,830
-
kW-mo/yr
$27,660
-
MMBtu
TOTAL IMPLEMENTED $6,294 $16,640 $1,044
16,588
kWh
$1,830
-
kW-mo/yr
$3,420
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs