Assessment Year | 2012 |
---|---|
Principal Product | Plastic Products |
NAICS | 326111: Plastics Bag and Pouch Manufacturing |
SIC | 3089: Plastics Products, Not Elsewhere Classified |
Sales Range | $50 M to 100M |
# of Employees | 125 |
Plant Area |
210,000
ft2
|
Annual Production | 10,000,000
pieces
|
Production Hrs. Annual | 8,736
hrs
|
Location (State) | Florida |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $762,198 | 9,594,688 |
kWh
|
$0.079 |
Electricity Demand | $107,386 | 22,208 |
kW-mo/yr
|
$4.84 |
Electricity Fees | $119,299 | - |
|
- |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $215,242 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $138,737 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
---|---|---|---|---|---|---|
01 | 2.2622: Replace existing chiller with high efficiency model | $69,199 | $111,000 |
$63,830
807,976
kWh
|
$5,369
-
kW-mo/yr
|
|
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $39,024 | $168,378 |
$34,821
440,758
kWh
|
$4,203
-
kW-mo/yr
|
|
03 | 2.7496: Install partitions to reduce size of conditioned space | $26,164 | $22,464 |
$24,132
305,465
kWh
|
$2,032
-
kW-mo/yr
|
|
04 | 2.7425: Clean or color roof to reduce solar load | $21,533 | $46,296 |
$19,864
251,442
kWh
|
$1,669
-
kW-mo/yr
|
|
05 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $15,948 | $7,160 |
$14,710
186,202
kWh
|
$1,238
-
kW-mo/yr
|
|
06 | 2.7221: Lower temperature during the winter season and vice-versa | $14,915 | $80 |
$13,759
174,161
kWh
|
$1,156
-
kW-mo/yr
|
|
07 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $9,865 | $1,660 |
$8,485
106,874
kWh
|
$1,380
-
kW-mo/yr
|
|
08 | 2.4231: Reduce the pressure of compressed air to the minimum required | $6,849 | $80 |
$6,320
79,606
kWh
|
$529
-
kW-mo/yr
|
|
09 | 2.1121: Use insulation in furnaces to facilitate heating / cooling | $5,382 | $385 |
$4,608
58,327
kWh
|
$774
-
kW-mo/yr
|
|
10 | 2.7135: Install occupancy sensors | $2,325 | $480 |
$2,146
27,170
kWh
|
$179
-
kW-mo/yr
|
|
11 | 2.7145: Install skylights | $2,117 | $3,000 |
$1,812
22,932
kWh
|
$305
-
kW-mo/yr
|
|
12 | 2.7447: Install vinyl strip / high speed / air curtain doors | $1,297 | $460 |
$1,193
15,110
kWh
|
$104
-
kW-mo/yr
|
|
13 | 2.7447: Install vinyl strip / high speed / air curtain doors | $624 | $1,852 |
$576
7,294
kWh
|
$48
-
kW-mo/yr
|
|
TOTAL RECOMMENDED | $215,242 | $363,295 |
$196,256
2,483,317
kWh
|
$18,986
-
kW-mo/yr
|
||
TOTAL IMPLEMENTED | $138,737 | $141,461 |
$126,861
1,604,915
kWh
|
$11,876
-
kW-mo/yr
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs