ITAC Assessment: TN0488
ITAC logo
ITAC Assessment: TN0488
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product Mattress pads, box springs, sweat pa
NAICS
n/a
SIC 2392: House furnishing, Except Curtains and Draperies
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area 98,000
ft2
Annual Production 17,640,000
pieces
Production Hrs. Annual 2,125
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $54,844 778,722
kWh
Natural Gas $15,290 2,291
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $6,259 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,925

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.4111: Utilize energy-efficient belts and other improved mechanisms $636 $1,060 $636
9,086
kWh
02 2.4231: Reduce the pressure of compressed air to the minimum required $513 - $513
7,327
kWh
03 2.7142: Utilize higher efficiency lamps and/or ballasts $226 $358 $226
3,224
kWh
04 2.4221: Install compressor air intakes in coolest locations $185 $510 $185
2,638
kWh
05 2.4314: Use synthetic lubricant $62 - $62
879
kWh
06 2.3131: Reschedule plant operations or reduce load to avoid peaks $4,637 - $4,637
-
kWh
TOTAL RECOMMENDED $6,259 $1,928 $6,259
23,154
kWh
TOTAL IMPLEMENTED $4,925 $358 $4,925
4,103
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs