ITAC Assessment: LE0201
ITAC logo
ITAC Assessment: LE0201
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Semi Conductor Wet Process Benches
NAICS 333242: Semiconductor Machinery Manufacturing
SIC 3559: Special Industry Machinery, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 163
Plant Area 70,000
ft2
Annual Production 30
pieces
Production Hrs. Annual 8,400
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $334,661 4,669,891
kWh
Electricity Demand $67,038 10,482
kW-mo/yr
Natural Gas $31,676 2,563
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $23,301 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $15,825

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $7,994 - $7,994
111,032
kWh
-
02 2.6231: Utilize controls to operate equipment only when needed $5,658 - $5,044
70,053
kWh
$614
-
kW-mo/yr
03 2.3131: Reschedule plant operations or reduce load to avoid peaks $3,356 $2,500 - $3,356
-
kW-mo/yr
04 2.4226: Use / purchase optimum sized compressor $1,622 $450 $1,294
17,970
kWh
$328
-
kW-mo/yr
05 2.6231: Utilize controls to operate equipment only when needed $551 $150 $551
7,647
kWh
-
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $196 $150 $174
2,415
kWh
$22
-
kW-mo/yr
07 2.7111: Reduce illumination to minimum necessary levels $3,924 $2,115 $3,783
52,536
kWh
$141
-
kW-mo/yr
TOTAL RECOMMENDED $23,301 $5,365 $18,840
261,653
kWh
$4,461
-
kW-mo/yr
TOTAL IMPLEMENTED $15,825 $4,765 $12,328
171,215
kWh
$3,497
-
kW-mo/yr
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs