| Assessment Year | 2004 |
|---|---|
| Principal Product | Semi Conductor Wet Process Benches |
| NAICS | 333242: Semiconductor Machinery Manufacturing |
| SIC | 3559: Special Industry Machinery, Not Elsewhere Classified |
| Sales Range | $50 M to 100M |
| # of Employees | 163 |
| Plant Area |
70,000
ft2
|
| Annual Production | 30
pieces
|
| Production Hrs. Annual | 8,400
hrs
|
| Location (State) | Pennsylvania |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $334,661 | 4,669,891 |
kWh
|
$0.072 |
| Electricity Demand | $67,038 | 10,482 |
kW-mo/yr
|
$6.40 |
| Natural Gas | $31,676 | 2,563 |
MMBtu
|
$12.36 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $23,301 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $15,825 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
|---|---|---|---|---|---|---|
| 01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $7,994 | - |
$7,994
111,032
kWh
|
- | |
| 02 | 2.6231: Utilize controls to operate equipment only when needed | $5,658 | - |
$5,044
70,053
kWh
|
$614
-
kW-mo/yr
|
|
| 03 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $3,356 | $2,500 | - |
$3,356
-
kW-mo/yr
|
|
| 04 | 2.4226: Use / purchase optimum sized compressor | $1,622 | $450 |
$1,294
17,970
kWh
|
$328
-
kW-mo/yr
|
|
| 05 | 2.6231: Utilize controls to operate equipment only when needed | $551 | $150 |
$551
7,647
kWh
|
- | |
| 06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $196 | $150 |
$174
2,415
kWh
|
$22
-
kW-mo/yr
|
|
| 07 | 2.7111: Reduce illumination to minimum necessary levels | $3,924 | $2,115 |
$3,783
52,536
kWh
|
$141
-
kW-mo/yr
|
|
| TOTAL RECOMMENDED | $23,301 | $5,365 |
$18,840
261,653
kWh
|
$4,461
-
kW-mo/yr
|
||
| TOTAL IMPLEMENTED | $15,825 | $4,765 |
$12,328
171,215
kWh
|
$3,497
-
kW-mo/yr
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs