| Assessment Year | 2006 |
|---|---|
| Principal Product | mailboxes |
| NAICS | 332439: Other Metal Container Manufacturing |
| SIC | 3499: Fabricated Metal Products, Not Elsewhere Classified |
| Sales Range | $50 M to 100M |
| # of Employees | 225 |
| Plant Area |
240,000
ft2
|
| Annual Production | 5,500,000
pieces
|
| Production Hrs. Annual | 2,040
hrs
|
| Location (State) | Mississippi |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $253,664 | 3,913,280 |
kWh
|
$0.065 |
| Electricity Demand | $74,213 | 12,369 |
kW-mo/yr
|
$6.00 |
| Electricity Fees | $4,918 | - |
|
- |
| Natural Gas | $390,088 | 28,194 |
MMBtu
|
$13.84 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $23,836 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $15,321 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $10,023 | $29,904 |
$7,145
168,118
kWh
|
$2,730
-
kW-mo/yr
|
$148 | |
| 02 | 2.4239: Eliminate or reduce compressed air usage | $7,196 | $192 |
$7,145
80,302
kWh
|
- | $51 | |
| 03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,023 | $10,455 |
$1,447
34,053
kWh
|
$546
-
kW-mo/yr
|
$30 | |
| 04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,779 | $231 |
$1,752
41,223
kWh
|
- | $27 | |
| 05 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,496 | $4,275 |
$982
23,102
kWh
|
$492
-
kW-mo/yr
|
$22 | |
| 06 | 2.4221: Install compressor air intakes in coolest locations | $1,319 | $805 |
$850
19,997
kWh
|
$450
-
kW-mo/yr
|
$19 | |
| TOTAL RECOMMENDED | $23,836 | $45,862 |
$19,321
366,795
kWh
|
$4,218
-
kW-mo/yr
|
$297 | ||
| TOTAL IMPLEMENTED | $15,321 | $44,865 |
$11,326
266,496
kWh
|
$3,768
-
kW-mo/yr
|
$227 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs