Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Corrugated Board
NAICS 322211: Corrugated and Solid Fiber Box Manufacturing
SIC 2653: Corrugated and Solid Fiber Boxes
Sales Range $50
M
to 100
M
# of Employees 89
Plant Area 160,000
ft2
Annual Production 80,857
ton
Production Hrs. Annual 6,240
hrs
Location (State) New Jersey

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $354,704 4,985,845
kWh
Electricity Demand $91,171 11,417
kW-mo/yr
Natural Gas $509,879 53,295
MMBtu
Fuel Oil #2 $276,501 51,738
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $698,568 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $49,557

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Fuel Oil #2 Savings
01 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $575,674 $984,000 $345,128
4,860,960
kWh
$78,622
-
kW-mo/yr
$151,924
-
MMBtu
-
02 2.7491: Insulate glazing, walls, ceilings, and roofs $29,156 $14,088 - - $29,156
-
MMBtu
-
03 2.2426: Use waste heat from flue gases to heat space conditioning air $33,048 $40,000 - - - $33,048
-
MMBtu
04 2.7447: Install vinyl strip / high speed / air curtain doors $19,946 $48,000 - - $19,946
-
MMBtu
-
05 2.2136: Install / repair insulation on steam lines $16,168 $6,683 - - - $16,168
-
MMBtu
06 2.4221: Install compressor air intakes in coolest locations $8,604 $40,000 $7,198
101,381
kWh
$1,406
-
kW-mo/yr
- -
07 2.4111: Utilize energy-efficient belts and other improved mechanisms $5,095 - $4,351
61,286
kWh
$744
-
kW-mo/yr
- -
08 2.6218: Turn off equipment when not in use $5,089 - $5,089
71,679
kWh
- - -
09 2.7447: Install vinyl strip / high speed / air curtain doors $2,529 $12,960 - - $2,529
-
MMBtu
-
10 2.4221: Install compressor air intakes in coolest locations $2,299 $1,200 $1,910
26,905
kWh
$389
-
kW-mo/yr
- -
11 2.7441: Replace broken windows and/or window sash $960 $200 - - $960
-
MMBtu
-
TOTAL RECOMMENDED $698,568 $1,147,131 $363,676
5,122,211
kWh
$81,161
-
kW-mo/yr
$204,515
-
MMBtu
$49,216
-
MMBtu
TOTAL IMPLEMENTED $49,557 $56,083 $11,350
159,870
kWh
$1,133
-
kW-mo/yr
$20,906
-
MMBtu
$16,168
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Fuel Oil #2 Savings