ITAC Assessment: LE0191
ITAC logo
ITAC Assessment: LE0191
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Envelope
NAICS 322230: Stationery Product Manufacturing
SIC 2677: Envelopes
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area 127,000
ft2
Annual Production 2,400,000
pieces
Production Hrs. Annual 8,736
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $566,244 11,583,400
kWh
Electricity Demand $270,206 22,461
kW-mo/yr
Natural Gas $36,337 3,496
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $60,250 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $27,536

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.1321: Replace fossil fuel equipment with electrical equipment $19,209 $8,000 - - - $19,209
-
MMBtu
02 2.3131: Reschedule plant operations or reduce load to avoid peaks $13,043 $2,500 - $13,043
-
kW-mo/yr
- -
03 2.7447: Install vinyl strip / high speed / air curtain doors $9,591 $3,200 - - - $9,591
-
MMBtu
04 2.3212: Optimize plant power factor $8,221 $2,500 - - $8,221 -
05 2.7261: Install timers and/or thermostats $4,530 $750 $4,530
92,454
kWh
- - -
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $3,195 - $2,293
47,772
kWh
$902
-
kW-mo/yr
- -
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,161 $200 $868
17,711
kWh
$293
-
kW-mo/yr
- -
08 2.7442: Keep doors and windows shut when not on use $581 - - - - $581
-
MMBtu
09 2.7135: Install occupancy sensors $719 $750 $719
14,676
kWh
- - -
TOTAL RECOMMENDED $60,250 $17,900 $8,410
172,613
kWh
$14,238
-
kW-mo/yr
$8,221 $29,381
-
MMBtu
TOTAL IMPLEMENTED $27,536 $5,950 $5,398
110,165
kWh
$13,336
-
kW-mo/yr
$8,221 $581
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs