ITAC Assessment: LE0187
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Steel Joists
NAICS 332312: Fabricated Structural Metal Manufacturing
SIC 3441: Fabricated Structural Metal
Sales Range less than $500
k
# of Employees 329
Plant Area 280,000
ft2
Annual Production 45,000
ton
Production Hrs. Annual 2,080
hrs
Location (State) Maryland

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $102,472 3,919,998
kWh
Electricity Demand $139,871 11,940
kW-mo/yr
Natural Gas $129,600 17,134
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $42,184 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $10,916

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.3131: Reschedule plant operations or reduce load to avoid peaks $18,829 $10,000 - - $18,829 -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $9,995 $500 $2,701
107,983
kWh
$7,294
-
kW-mo/yr
- -
03 2.7441: Replace broken windows and/or window sash $5,383 $9,360 - - - $5,383
-
MMBtu
04 2.7491: Insulate glazing, walls, ceilings, and roofs $4,271 $40,064 - - - $4,271
-
MMBtu
05 2.4226: Use / purchase optimum sized compressor $1,975 $15,000 $1,975
78,988
kWh
- - -
06 2.4221: Install compressor air intakes in coolest locations $921 $500 $125
4,982
kWh
$796
-
kW-mo/yr
- -
07 2.4314: Use synthetic lubricant $810 $500 $213
8,754
kWh
$597
-
kW-mo/yr
- -
TOTAL RECOMMENDED $42,184 $75,924 $5,014
200,707
kWh
$8,687
-
kW-mo/yr
$18,829 $9,654
-
MMBtu
TOTAL IMPLEMENTED $10,916 $1,000 $2,826
112,965
kWh
$8,090
-
kW-mo/yr
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs