Assessment Year | 2004 |
---|---|
Principal Product | Steel Joists |
NAICS | 332312: Fabricated Structural Metal Manufacturing |
SIC | 3441: Fabricated Structural Metal |
Sales Range | less than $500 k |
# of Employees | 329 |
Plant Area |
280,000
ft2
|
Annual Production | 45,000
ton
|
Production Hrs. Annual | 2,080
hrs
|
Location (State) | Maryland |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $102,472 | 3,919,998 |
kWh
|
$0.026 |
Electricity Demand | $139,871 | 11,940 |
kW-mo/yr
|
$11.71 |
Natural Gas | $129,600 | 17,134 |
MMBtu
|
$7.56 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $42,184 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $10,916 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $18,829 | $10,000 | - | - | $18,829 | - | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $9,995 | $500 |
$2,701
107,983
kWh
|
$7,294
-
kW-mo/yr
|
- | - | |
03 | 2.7441: Replace broken windows and/or window sash | $5,383 | $9,360 | - | - | - |
$5,383
-
MMBtu
|
|
04 | 2.7491: Insulate glazing, walls, ceilings, and roofs | $4,271 | $40,064 | - | - | - |
$4,271
-
MMBtu
|
|
05 | 2.4226: Use / purchase optimum sized compressor | $1,975 | $15,000 |
$1,975
78,988
kWh
|
- | - | - | |
06 | 2.4221: Install compressor air intakes in coolest locations | $921 | $500 |
$125
4,982
kWh
|
$796
-
kW-mo/yr
|
- | - | |
07 | 2.4314: Use synthetic lubricant | $810 | $500 |
$213
8,754
kWh
|
$597
-
kW-mo/yr
|
- | - | |
TOTAL RECOMMENDED | $42,184 | $75,924 |
$5,014
200,707
kWh
|
$8,687
-
kW-mo/yr
|
$18,829 |
$9,654
-
MMBtu
|
||
TOTAL IMPLEMENTED | $10,916 | $1,000 |
$2,826
112,965
kWh
|
$8,090
-
kW-mo/yr
|
- | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs