ITAC Assessment: TT0295
ITAC logo
ITAC Assessment: TT0295
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Heating Equipment
NAICS 333994: Industrial Process Furnace and Oven Manufacturing
SIC 3567: Industrial Process Furnaces and Ovens
Sales Range $50
M
to 100
M
# of Employees 230
Plant Area 140,000
ft2
Annual Production 250
units
Production Hrs. Annual 7,488
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $153,529 1,967,614
kWh
Electricity Demand $82,672 5,656
kW-mo/yr
Natural Gas $161,812 16,977
MMBtu
Waste Disposal Costs
Water Usage $9,542 1,806
Tgal
Water Disposal $21,271 1,806
Tgal
TOTAL YEARLY COSTS $428,826
RECOMMENDED SAVINGS* $26,493 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.9114: Use solar heat to make electricty $13,897 $44,225 $13,897
178,168
kWh
-
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $7,115 $20,000 $7,115
91,223
kWh
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,010 $1,360 $2,937
37,658
kWh
$73
-
kW-mo/yr
04 2.4221: Install compressor air intakes in coolest locations $1,448 $2,000 $1,448
18,570
kWh
-
05 2.7135: Install occupancy sensors $646 $2,610 $646
8,287
kWh
-
06 2.7224: Reduce space conditioning during non-working hours $377 $150 $377
4,837
kWh
-
TOTAL RECOMMENDED $26,493 $70,345 $26,420
338,743
kWh
$73
-
kW-mo/yr
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs