Assessment Year | 2023 |
---|---|
Principal Product | Heating Equipment |
NAICS | 333994: Industrial Process Furnace and Oven Manufacturing |
SIC | 3567: Industrial Process Furnaces and Ovens |
Sales Range | $50 M to 100M |
# of Employees | 230 |
Plant Area |
140,000
ft2
|
Annual Production | 250
units
|
Production Hrs. Annual | 7,488
hrs
|
Location (State) | Tennessee |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $153,529 | 1,967,614 |
kWh
|
$0.078 | |
Electricity Demand | $82,672 | 5,656 |
kW-mo/yr
|
$14.62 | |
Natural Gas | $161,812 | 16,977 |
MMBtu
|
$9.53 | |
Waste Disposal Costs | |||||
Water Usage | $9,542 | 1,806 |
Tgal
|
$5.28 | |
Water Disposal | $21,271 | 1,806 |
Tgal
|
$11.78 | |
TOTAL YEARLY COSTS | $428,826 | ||||
RECOMMENDED SAVINGS* | $26,493 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
---|---|---|---|---|---|---|
01 | 2.9114: Use solar heat to make electricty | $13,897 | $44,225 |
$13,897
178,168
kWh
|
- | |
02 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $7,115 | $20,000 |
$7,115
91,223
kWh
|
- | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,010 | $1,360 |
$2,937
37,658
kWh
|
$73
-
kW-mo/yr
|
|
04 | 2.4221: Install compressor air intakes in coolest locations | $1,448 | $2,000 |
$1,448
18,570
kWh
|
- | |
05 | 2.7135: Install occupancy sensors | $646 | $2,610 |
$646
8,287
kWh
|
- | |
06 | 2.7224: Reduce space conditioning during non-working hours | $377 | $150 |
$377
4,837
kWh
|
- | |
TOTAL RECOMMENDED | $26,493 | $70,345 |
$26,420
338,743
kWh
|
$73
-
kW-mo/yr
|
||
TOTAL IMPLEMENTED | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs