| Assessment Year | 2003 |
|---|---|
| Principal Product | Folding Cartons |
| NAICS | 322212: Folding Paperboard Box Manufacturing |
| SIC | 2657: Folding Paperboard Boxes, Including Sanitary |
| Sales Range | $5 M to 10M |
| # of Employees | 58 |
| Plant Area |
65,000
ft2
|
| Annual Production | 4,000
ton
|
| Production Hrs. Annual | 6,240
hrs
|
| Location (State) | Pennsylvania |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $109,291 | 1,904,400 |
kWh
|
$0.057 |
| Electricity Demand | $30,820 | 4,441 |
kW-mo/yr
|
$6.94 |
| Natural Gas | $20,207 | 2,468 |
MMBtu
|
$8.19 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $22,467 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Ancillary Material Cost Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.7447: Install vinyl strip / high speed / air curtain doors | $7,875 | $8,500 | - | - |
$7,875
-
MMBtu
|
- | |
| 02 | 2.7111: Reduce illumination to minimum necessary levels | $4,633 | $131 |
$3,557
62,400
kWh
|
$833
-
kW-mo/yr
|
- | $243 | |
| 03 | 2.7224: Reduce space conditioning during non-working hours | $2,865 | $630 |
$2,865
49,920
kWh
|
- | - | - | |
| 04 | 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary | $2,812 | $1,000 |
$2,812
49,000
kWh
|
- | - | - | |
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,764 | $16,220 |
$1,440
25,085
kWh
|
$335
-
kW-mo/yr
|
- | $989 | |
| 06 | 2.7261: Install timers and/or thermostats | $1,209 | $210 | - | - |
$1,209
-
MMBtu
|
- | |
| 07 | 2.7135: Install occupancy sensors | $309 | $525 |
$309
5,419
kWh
|
- | - | - | |
| TOTAL RECOMMENDED | $22,467 | $27,216 |
$10,983
191,824
kWh
|
$1,168
-
kW-mo/yr
|
$9,084
-
MMBtu
|
$1,232 | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Ancillary Material Cost Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs