ITAC Assessment: LE0172
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Folding Cartons
NAICS 322212: Folding Paperboard Box Manufacturing
SIC 2657: Folding Paperboard Boxes, Including Sanitary
Sales Range $5
M
to 10
M
# of Employees 58
Plant Area 65,000
ft2
Annual Production 4,000
ton
Production Hrs. Annual 6,240
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $109,291 1,904,400
kWh
Electricity Demand $30,820 4,441
kW-mo/yr
Natural Gas $20,207 2,468
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $22,467 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Ancillary Material Cost Savings
01 2.7447: Install vinyl strip / high speed / air curtain doors $7,875 $8,500 - - $7,875
-
MMBtu
-
02 2.7111: Reduce illumination to minimum necessary levels $4,633 $131 $3,557
62,400
kWh
$833
-
kW-mo/yr
- $243
03 2.7224: Reduce space conditioning during non-working hours $2,865 $630 $2,865
49,920
kWh
- - -
04 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary $2,812 $1,000 $2,812
49,000
kWh
- - -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $2,764 $16,220 $1,440
25,085
kWh
$335
-
kW-mo/yr
- $989
06 2.7261: Install timers and/or thermostats $1,209 $210 - - $1,209
-
MMBtu
-
07 2.7135: Install occupancy sensors $309 $525 $309
5,419
kWh
- - -
TOTAL RECOMMENDED $22,467 $27,216 $10,983
191,824
kWh
$1,168
-
kW-mo/yr
$9,084
-
MMBtu
$1,232
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs