ITAC Assessment: LE0168
ITAC logo
ITAC Assessment: LE0168
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Hi-Tech Rubber Parts
NAICS 326121: Unlaminated Plastics Profile Shape Manufacturing
SIC 3082: Unsupported Plastics Profile Shapes
Sales Range $10
M
to 50
M
# of Employees 50
Plant Area 44,000
ft2
Annual Production 0
units
Production Hrs. Annual 4,680
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $88,789 759,290
kWh
Electricity Demand $12,501 1,069
kW-mo/yr
Natural Gas $14,025 1,116
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $11,141 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,112

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4221: Install compressor air intakes in coolest locations $2,831 $1,000 $2,082
21,245
kWh
$749
-
kW-mo/yr
-
02 2.7261: Install timers and/or thermostats $5,145 $1,050 $5,145
52,500
kWh
- -
03 2.7261: Install timers and/or thermostats $1,053 $1,000 - - $1,053
-
MMBtu
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,082 $100 $836
8,529
kWh
$246
-
kW-mo/yr
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $1,030 $2,638 $664
6,771
kWh
$366
-
kW-mo/yr
-
TOTAL RECOMMENDED $11,141 $5,788 $8,727
89,045
kWh
$1,361
-
kW-mo/yr
$1,053
-
MMBtu
TOTAL IMPLEMENTED $2,112 $2,738 $1,500
15,300
kWh
$612
-
kW-mo/yr
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs