ITAC Assessment: LE0160
ITAC logo
ITAC Assessment: LE0160
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Optical Glasses
NAICS 327212: Other Pressed and Blown Glass and Glassware Manufacturing
SIC 3229: Pressed and Blown Glass and Glassware, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 400
Plant Area 800,000
ft2
Annual Production 3,500
ton
Production Hrs. Annual 8,736
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,590,727 36,637,000
kWh
Electricity Demand $335,189 59,378
kW-mo/yr
Natural Gas $306,595 53,359
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $33,707 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $10,271

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7135: Install occupancy sensors $160 $675 $160
3,676
kWh
- -
02 2.7124: Make a practice of turning off lights when not needed $1,934 - $1,934
44,554
kWh
- -
03 2.7111: Reduce illumination to minimum necessary levels $457 $54 $394
9,085
kWh
$63
-
kW-mo/yr
-
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,046 - $731
16,848
kWh
$315
-
kW-mo/yr
-
05 2.2511: Insulate bare equipment $7,291 $1,138 $7,291
167,985
kWh
- -
06 2.7444: Close holes and openings in building such as broken windows $3,229 $1,000 - - $3,229
-
MMBtu
07 2.4221: Install compressor air intakes in coolest locations $13,777 $1,500 $11,246
259,129
kWh
$2,531
-
kW-mo/yr
-
08 2.7447: Install vinyl strip / high speed / air curtain doors $5,813 $1,000 - - $5,813
-
MMBtu
TOTAL RECOMMENDED $33,707 $5,367 $21,756
501,277
kWh
$2,909
-
kW-mo/yr
$9,042
-
MMBtu
TOTAL IMPLEMENTED $10,271 $1,138 $9,956
229,387
kWh
$315
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs