| Assessment Year | 2001 |
|---|---|
| Principal Product | Die-cut Felt Material |
| NAICS |
n/a
|
| SIC | 2299: Textile goods, Not Elsewhere Classified |
| Sales Range | $5 M to 10M |
| # of Employees | 50 |
| Plant Area |
80,000
ft2
|
| Annual Production | 0
units
|
| Production Hrs. Annual | 2,080
hrs
|
| Location (State) | Pennsylvania |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $26,808 | 302,240 |
kWh
|
$0.089 |
| Electricity Demand | $5,134 | 1,808 |
kW-mo/yr
|
$2.84 |
| Natural Gas | $27,364 | 2,620 |
MMBtu
|
$10.44 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $13,260 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $1,461 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.4312: Improve lubrication practices | $272 | $200 |
$213
2,402
kWh
|
$59
-
kW-mo/yr
|
- | - | |
| 02 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $639 | - |
$500
5,647
kWh
|
$139
-
kW-mo/yr
|
- | - | |
| 03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $304 | - |
$304
3,422
kWh
|
- | - | - | |
| 04 | 2.6232: Install set-back timers | $7,324 | $2,100 | - | - |
$7,324
-
MMBtu
|
- | |
| 05 | 2.8113: Purchase gas directly from a contract gas supplier | $853 | $500 | - | - | - | $853 | |
| 06 | 2.2515: Use optimum thickness insulation | $246 | $350 | - | - |
$246
-
MMBtu
|
- | |
| 07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,622 | $2,820 |
$3,111
35,100
kWh
|
$511
-
kW-mo/yr
|
- | - | |
| TOTAL RECOMMENDED | $13,260 | $5,970 |
$4,128
46,571
kWh
|
$709
-
kW-mo/yr
|
$7,570
-
MMBtu
|
$853 | ||
| TOTAL IMPLEMENTED | $1,461 | $550 |
$1,017
11,471
kWh
|
$198
-
kW-mo/yr
|
$246
-
MMBtu
|
- | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs