ITAC Assessment: KU0521
ITAC logo
ITAC Assessment: KU0521
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product wall ties and wall forms
NAICS
n/a
SIC 3444: Sheet Metal Work
Sales Range $10
M
to 50
M
# of Employees 120
Plant Area 29,300
ft2
Annual Production 11,000,000
lb
Production Hrs. Annual 5,080
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $23,513 571,512
kWh
Electricity Demand $5,251 1,466
kW-mo/yr
Natural Gas $8,605 1,460
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $72,880 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $69,690

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.7231: Use radiant heater for spot heating $3,190 $8,580 - - $3,190
-
MMBtu
- -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $640 $500 $530
13,189
kWh
$110
-
kW-mo/yr
- - -
03 2.4221: Install compressor air intakes in coolest locations $210 $270 $170
4,103
kWh
$40
-
kW-mo/yr
- - -
04 2.4314: Use synthetic lubricant $230 $640 $150
3,810
kWh
$30
-
kW-mo/yr
- - $50
05 4.446: Automate finishing process $68,610 $109,420 $(-4,410.0)
(-110,492)
kWh
$(-950.0)
-
kW-mo/yr
- $73,970 -
TOTAL RECOMMENDED $72,880 $119,410 $(-3,560.0)
(-89,390)
kWh
$(-770.0)
-
kW-mo/yr
$3,190
-
MMBtu
$73,970 $50
TOTAL IMPLEMENTED $69,690 $110,830 $(-3,560.0)
(-89,390)
kWh
$(-770.0)
-
kW-mo/yr
- $73,970 $50
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs