| Assessment Year | 1995 |
|---|---|
| Principal Product | water jet cutting systems |
| NAICS |
n/a
|
| SIC | 3541: Machine Tools, Metal Cutting Types |
| Sales Range | $10 M to 50M |
| # of Employees | 126 |
| Plant Area |
71,000
ft2
|
| Annual Production | 88
pieces
|
| Production Hrs. Annual | 4,788
hrs
|
| Location (State) | Kansas |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $143,027 | 2,675,557 |
kWh
|
$0.053 |
| Natural Gas | $3,551 | 661 |
MMBtu
|
$5.37 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $50,232 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $44,607 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Personnel Changes Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $28,987 | $18,760 |
$48,577
908,558
kWh
|
$(-19,590.0)
-
MMBtu
|
- | |
| 02 | 2.2437: Recover waste heat from equipment | $8,681 | $10,200 |
$8,681
162,368
kWh
|
- | - | |
| 03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,625 | $8,741 |
$3,244
60,668
kWh
|
- | $1,381 | |
| 04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,851 | $5,940 |
$2,398
44,842
kWh
|
- | $453 | |
| 05 | 2.7135: Install occupancy sensors | $2,037 | $1,750 |
$2,037
38,101
kWh
|
- | - | |
| 06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $778 | $1,140 |
$345
6,448
kWh
|
- | $433 | |
| 07 | 2.7134: Use photocell controls | $548 | $120 |
$548
10,258
kWh
|
- | - | |
| 08 | 2.6231: Utilize controls to operate equipment only when needed | $737 | $333 |
$737
13,775
kWh
|
- | - | |
| 09 | 2.2437: Recover waste heat from equipment | $831 | $865 |
$831
15,533
kWh
|
- | - | |
| 10 | 2.4221: Install compressor air intakes in coolest locations | $157 | $176 |
$157
2,931
kWh
|
- | - | |
| TOTAL RECOMMENDED | $50,232 | $48,025 |
$67,555
1,263,482
kWh
|
$(-19,590.0)
-
MMBtu
|
$2,267 | ||
| TOTAL IMPLEMENTED | $44,607 | $40,002 |
$62,383
1,166,764
kWh
|
$(-19,590.0)
-
MMBtu
|
$1,814 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Personnel Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs