ITAC Assessment: KU0444
ITAC logo
ITAC Assessment: KU0444
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Paper Products
NAICS
n/a
SIC 2675: Die-Cut Paper and Paperboard and Cardboard
Sales Range $100
M
to 500
M
# of Employees 400
Plant Area
n/a
Annual Production 208,000,000
lb
Production Hrs. Annual 6,720
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $141,812 2,359,613
kWh
Natural Gas $28,842 5,473
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $19,447 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,931

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7135: Install occupancy sensors $4,238 $2,540 $4,238
69,461
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $3,761 $6,016 $3,761
48,945
kWh
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $551 $207 $551
9,086
kWh
-
04 2.4133: Use most efficient type of electric motors $3,668 $4,776 $3,668
61,547
kWh
-
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,465 $446 $2,465
41,032
kWh
-
06 2.4221: Install compressor air intakes in coolest locations $2,289 $2,220 $2,289
38,101
kWh
-
07 2.4231: Reduce the pressure of compressed air to the minimum required $951 $300 $951
15,826
kWh
-
08 2.7447: Install vinyl strip / high speed / air curtain doors $996 $6,391 - $996
-
MMBtu
09 2.2511: Insulate bare equipment $528 $252 $528
8,792
kWh
-
TOTAL RECOMMENDED $19,447 $23,148 $18,451
292,790
kWh
$996
-
MMBtu
TOTAL IMPLEMENTED $8,931 $11,299 $8,931
135,404
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs