Assessment Year | 1994 |
---|---|
Principal Product | Paper Products |
NAICS |
n/a
|
SIC | 2675: Die-Cut Paper and Paperboard and Cardboard |
Sales Range | $100 M to 500M |
# of Employees | 400 |
Plant Area |
n/a
|
Annual Production | 208,000,000
lb
|
Production Hrs. Annual | 6,720
hrs
|
Location (State) | Missouri |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $141,812 | 2,359,613 |
kWh
|
$0.060 |
Natural Gas | $28,842 | 5,473 |
MMBtu
|
$5.27 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $19,447 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $8,931 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.7135: Install occupancy sensors | $4,238 | $2,540 |
$4,238
69,461
kWh
|
- | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,761 | $6,016 |
$3,761
48,945
kWh
|
- | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $551 | $207 |
$551
9,086
kWh
|
- | |
04 | 2.4133: Use most efficient type of electric motors | $3,668 | $4,776 |
$3,668
61,547
kWh
|
- | |
05 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $2,465 | $446 |
$2,465
41,032
kWh
|
- | |
06 | 2.4221: Install compressor air intakes in coolest locations | $2,289 | $2,220 |
$2,289
38,101
kWh
|
- | |
07 | 2.4231: Reduce the pressure of compressed air to the minimum required | $951 | $300 |
$951
15,826
kWh
|
- | |
08 | 2.7447: Install vinyl strip / high speed / air curtain doors | $996 | $6,391 | - |
$996
-
MMBtu
|
|
09 | 2.2511: Insulate bare equipment | $528 | $252 |
$528
8,792
kWh
|
- | |
TOTAL RECOMMENDED | $19,447 | $23,148 |
$18,451
292,790
kWh
|
$996
-
MMBtu
|
||
TOTAL IMPLEMENTED | $8,931 | $11,299 |
$8,931
135,404
kWh
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs