Assessment Year | 1994 |
---|---|
Principal Product | processed meat |
NAICS |
n/a
|
SIC | 2013: Sausages and Other Prepared Meat Products |
Sales Range | $10 M to 50M |
# of Employees | 150 |
Plant Area |
54,849
ft2
|
Annual Production | 15,000,000
lb
|
Production Hrs. Annual | 4,420
hrs
|
Location (State) | Nebraska |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $102,939 | 3,614,009 |
kWh
|
$0.028 |
Natural Gas | $123,364 | 12,654 |
MMBtu
|
$9.75 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $7,735 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $217 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,070 | $8,217 |
$3,070
74,736
kWh
|
- | |
02 | 2.7135: Install occupancy sensors | $1,866 | $1,720 |
$1,866
45,428
kWh
|
- | |
03 | 2.7124: Make a practice of turning off lights when not needed | $746 | - |
$746
18,171
kWh
|
- | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $84 | $396 |
$84
2,052
kWh
|
- | |
05 | 2.2449: Recover heat from exhausted steam, hot air or hot water | $869 | $1,858 | - |
$869
-
MMBtu
|
|
06 | 2.4231: Reduce the pressure of compressed air to the minimum required | $458 | $8 |
$458
11,137
kWh
|
- | |
07 | 2.4221: Install compressor air intakes in coolest locations | $217 | $183 |
$217
5,275
kWh
|
- | |
08 | 2.7447: Install vinyl strip / high speed / air curtain doors | $239 | $42 |
$157
3,810
kWh
|
$82
-
MMBtu
|
|
09 | 2.2511: Insulate bare equipment | $186 | $114 |
$84
2,052
kWh
|
$102
-
MMBtu
|
|
TOTAL RECOMMENDED | $7,735 | $12,538 |
$6,682
162,661
kWh
|
$1,053
-
MMBtu
|
||
TOTAL IMPLEMENTED | $217 | $183 |
$217
5,275
kWh
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs