| Assessment Year | 1994 |
|---|---|
| Principal Product | processed meat |
| NAICS |
n/a
|
| SIC | 2013: Sausages and Other Prepared Meat Products |
| Sales Range | $10 M to 50M |
| # of Employees | 150 |
| Plant Area |
54,849
ft2
|
| Annual Production | 15,000,000
lb
|
| Production Hrs. Annual | 4,420
hrs
|
| Location (State) | Nebraska |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $102,939 | 3,614,009 |
kWh
|
$0.028 |
| Natural Gas | $123,364 | 12,654 |
MMBtu
|
$9.75 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $7,735 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $217 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,070 | $8,217 |
$3,070
74,736
kWh
|
- | |
| 02 | 2.7135: Install occupancy sensors | $1,866 | $1,720 |
$1,866
45,428
kWh
|
- | |
| 03 | 2.7124: Make a practice of turning off lights when not needed | $746 | - |
$746
18,171
kWh
|
- | |
| 04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $84 | $396 |
$84
2,052
kWh
|
- | |
| 05 | 2.2449: Recover heat from exhausted steam, hot air or hot water | $869 | $1,858 | - |
$869
-
MMBtu
|
|
| 06 | 2.4231: Reduce the pressure of compressed air to the minimum required | $458 | $8 |
$458
11,137
kWh
|
- | |
| 07 | 2.4221: Install compressor air intakes in coolest locations | $217 | $183 |
$217
5,275
kWh
|
- | |
| 08 | 2.7447: Install vinyl strip / high speed / air curtain doors | $239 | $42 |
$157
3,810
kWh
|
$82
-
MMBtu
|
|
| 09 | 2.2511: Insulate bare equipment | $186 | $114 |
$84
2,052
kWh
|
$102
-
MMBtu
|
|
| TOTAL RECOMMENDED | $7,735 | $12,538 |
$6,682
162,661
kWh
|
$1,053
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $217 | $183 |
$217
5,275
kWh
|
- | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs