Assessment Year | 1994 |
---|---|
Principal Product | molded rubber products |
NAICS |
n/a
|
SIC | 3061: Molded, Extruded, and Lathe-Cut Mechanical Rubber Goods |
Sales Range | $1 M to 5M |
# of Employees | 11 |
Plant Area |
11,000
ft2
|
Annual Production | 3,000
pieces
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Kansas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $42,658 | 831,184 |
kWh
|
$0.051 |
Natural Gas | $1,693 | 331 |
MMBtu
|
$5.11 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $5,735 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $770 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,624 | $3,145 |
$1,624
31,653
kWh
|
- | |
02 | 2.7135: Install occupancy sensors | $211 | $250 |
$211
4,103
kWh
|
- | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $75 | $600 |
$75
1,465
kWh
|
- | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $256 | $450 |
$256
4,982
kWh
|
- | |
05 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $2,408 | $26,000 |
$4,181
81,477
kWh
|
$(-1,773.0)
-
MMBtu
|
|
06 | 2.4314: Use synthetic lubricant | $256 | $136 |
$256
4,982
kWh
|
- | |
07 | 2.6231: Utilize controls to operate equipment only when needed | $135 | $70 |
$135
2,638
kWh
|
- | |
08 | 2.7447: Install vinyl strip / high speed / air curtain doors | $304 | $549 |
$60
1,172
kWh
|
$244
-
MMBtu
|
|
09 | 2.4235: Remove or close off unneeded compressed air lines | $346 | $105 |
$346
6,741
kWh
|
- | |
10 | 2.4221: Install compressor air intakes in coolest locations | $120 | $163 |
$120
2,345
kWh
|
- | |
TOTAL RECOMMENDED | $5,735 | $31,468 |
$7,264
141,558
kWh
|
$(-1,529.0)
-
MMBtu
|
||
TOTAL IMPLEMENTED | $770 | $817 |
$526
10,258
kWh
|
$244
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs