ITAC Assessment: KU0395
ITAC logo
ITAC Assessment: KU0395
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product DISPOSABLE PLASTIC TUBES
NAICS
n/a
SIC 3841: Surgical and Medical Instruments and Apparatus
Sales Range $10
M
to 50
M
# of Employees 715
Plant Area
n/a
Annual Production 207,000,000
pieces
Production Hrs. Annual 7,680
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $583,424 14,049,531
kWh
Natural Gas $8,756 2,183
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $49,794 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $7,521 - $9,089
218,933
kWh
- $(-1,568.0)
02 2.7135: Install occupancy sensors $18,864 $8,935 $18,864
454,279
kWh
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $6,058 - - - $6,058
04 2.7111: Reduce illumination to minimum necessary levels $2,726 $400 $2,726
65,651
kWh
- -
05 2.7141: Lower light fixtures in high ceiling areas $7,132 $6,200 $7,132
171,747
kWh
- -
06 2.2511: Insulate bare equipment $4,454 $3,772 $4,454
107,268
kWh
- -
07 2.4221: Install compressor air intakes in coolest locations $2,762 $990 $2,762
66,530
kWh
- -
08 2.7261: Install timers and/or thermostats $277 $1,000 $189
4,396
kWh
$88
-
MMBtu
-
TOTAL RECOMMENDED $49,794 $21,297 $45,216
1,088,804
kWh
$88
-
MMBtu
$4,490
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs