Assessment Year | 1993 |
---|---|
Principal Product | DISPOSABLE PLASTIC TUBES |
NAICS |
n/a
|
SIC | 3841: Surgical and Medical Instruments and Apparatus |
Sales Range | $10 M to 50M |
# of Employees | 715 |
Plant Area |
n/a
|
Annual Production | 207,000,000
pieces
|
Production Hrs. Annual | 7,680
hrs
|
Location (State) | Missouri |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $583,424 | 14,049,531 |
kWh
|
$0.042 |
Natural Gas | $8,756 | 2,183 |
MMBtu
|
$4.01 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $49,794 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $7,521 | - |
$9,089
218,933
kWh
|
- | $(-1,568.0) | |
02 | 2.7135: Install occupancy sensors | $18,864 | $8,935 |
$18,864
454,279
kWh
|
- | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $6,058 | - | - | - | $6,058 | |
04 | 2.7111: Reduce illumination to minimum necessary levels | $2,726 | $400 |
$2,726
65,651
kWh
|
- | - | |
05 | 2.7141: Lower light fixtures in high ceiling areas | $7,132 | $6,200 |
$7,132
171,747
kWh
|
- | - | |
06 | 2.2511: Insulate bare equipment | $4,454 | $3,772 |
$4,454
107,268
kWh
|
- | - | |
07 | 2.4221: Install compressor air intakes in coolest locations | $2,762 | $990 |
$2,762
66,530
kWh
|
- | - | |
08 | 2.7261: Install timers and/or thermostats | $277 | $1,000 |
$189
4,396
kWh
|
$88
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $49,794 | $21,297 |
$45,216
1,088,804
kWh
|
$88
-
MMBtu
|
$4,490 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs