ITAC Assessment: KU0393
ITAC logo
ITAC Assessment: KU0393
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product FROZEN MEXICAN FOOD
NAICS
n/a
SIC 2038: Frozen Specialties, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 240
Plant Area
n/a
Annual Production 106,000,000
pieces
Production Hrs. Annual 4,680
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $100,493 2,328,839
kWh
Natural Gas $43,699 17,283
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $29,542 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,164

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.2621: Modify refrigeration system to operate at a lower pressure $14,813 $23,600 $14,813
343,200
kWh
- -
02 2.1393: Use steam sparging or injections in place of indirect heating $5,295 $6,925 - $5,295
-
MMBtu
-
03 2.3212: Optimize plant power factor $4,164 $11,320 $4,164
-
kWh
- -
04 3.6193: Install equipment (eg compactor) to reduce disposal costs $3,913 $14,300 $(-127.0)
(-2,931)
kWh
- $4,040
05 2.2511: Insulate bare equipment $574 $1,800 $164
3,810
kWh
$410
-
MMBtu
-
06 2.7135: Install occupancy sensors $344 $800 $344
7,913
kWh
- -
07 2.4221: Install compressor air intakes in coolest locations $316 $60 $316
7,327
kWh
- -
08 2.7261: Install timers and/or thermostats $123 $235 $93
2,052
kWh
$30
-
MMBtu
-
TOTAL RECOMMENDED $29,542 $59,040 $19,767
361,371
kWh
$5,735
-
MMBtu
$4,040
TOTAL IMPLEMENTED $4,164 $11,320 $4,164
-
kWh
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs