Assessment Year | 1993 |
---|---|
Principal Product | FROZEN MEXICAN FOOD |
NAICS |
n/a
|
SIC | 2038: Frozen Specialties, Not Elsewhere Classified |
Sales Range | $5 M to 10M |
# of Employees | 240 |
Plant Area |
n/a
|
Annual Production | 106,000,000
pieces
|
Production Hrs. Annual | 4,680
hrs
|
Location (State) | Kansas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $100,493 | 2,328,839 |
kWh
|
$0.043 |
Natural Gas | $43,699 | 17,283 |
MMBtu
|
$2.53 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $29,542 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $4,164 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.2621: Modify refrigeration system to operate at a lower pressure | $14,813 | $23,600 |
$14,813
343,200
kWh
|
- | - | |
02 | 2.1393: Use steam sparging or injections in place of indirect heating | $5,295 | $6,925 | - |
$5,295
-
MMBtu
|
- | |
03 | 2.3212: Optimize plant power factor | $4,164 | $11,320 |
$4,164
-
kWh
|
- | - | |
04 | 3.6193: Install equipment (eg compactor) to reduce disposal costs | $3,913 | $14,300 |
$(-127.0)
(-2,931)
kWh
|
- | $4,040 | |
05 | 2.2511: Insulate bare equipment | $574 | $1,800 |
$164
3,810
kWh
|
$410
-
MMBtu
|
- | |
06 | 2.7135: Install occupancy sensors | $344 | $800 |
$344
7,913
kWh
|
- | - | |
07 | 2.4221: Install compressor air intakes in coolest locations | $316 | $60 |
$316
7,327
kWh
|
- | - | |
08 | 2.7261: Install timers and/or thermostats | $123 | $235 |
$93
2,052
kWh
|
$30
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $29,542 | $59,040 |
$19,767
361,371
kWh
|
$5,735
-
MMBtu
|
$4,040 | ||
TOTAL IMPLEMENTED | $4,164 | $11,320 |
$4,164
-
kWh
|
- | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs