ITAC Assessment: KU0388
ITAC logo
ITAC Assessment: KU0388
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product BRAKE ACTUATORS, ETC
NAICS
n/a
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $50
M
to 100
M
# of Employees 475
Plant Area
n/a
Annual Production 3,300,000
pieces
Production Hrs. Annual 4,160
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $381,552 7,157,093
kWh
Natural Gas $64,063 14,947
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $41,594 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $17,156

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.8113: Purchase gas directly from a contract gas supplier $24,157 - - $24,157
-
MMBtu
-
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $5,781 $17,843 $5,781
108,441
kWh
- -
03 2.2437: Recover waste heat from equipment $3,530 $3,400 $3,530
66,237
kWh
- -
04 2.2521: Isolate steam lines to avoid heating air conditioned areas $1,078 $59,000 $1,078
20,223
kWh
- -
05 2.7261: Install timers and/or thermostats $1,892 $925 $1,296
24,326
kWh
$596
-
MMBtu
-
06 2.4221: Install compressor air intakes in coolest locations $3,155 $630 $3,155
59,203
kWh
- -
07 2.4227: Use compressor air filters $851 - $931
16,120
kWh
- $(-80.0)
08 2.4133: Use most efficient type of electric motors $182 $480 $182
3,517
kWh
- -
09 2.7142: Utilize higher efficiency lamps and/or ballasts $172 - $375
7,034
kWh
- $(-203.0)
10 2.6232: Install set-back timers $515 $900 $515
9,672
kWh
- -
11 2.6232: Install set-back timers $281 $91 $281
5,275
kWh
- -
TOTAL RECOMMENDED $41,594 $83,269 $17,124
320,048
kWh
$24,753
-
MMBtu
$(-283.0)
TOTAL IMPLEMENTED $17,156 $83,178 $16,843
314,773
kWh
$596
-
MMBtu
$(-283.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs