ITAC Assessment: KU0383
ITAC logo
ITAC Assessment: KU0383
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product FOLDING CARTONS
NAICS
n/a
SIC 2657: Folding Paperboard Boxes, Including Sanitary
Sales Range $10
M
to 50
M
# of Employees 110
Plant Area
n/a
Annual Production 11,762
ton
Production Hrs. Annual 6,240
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $202,204 3,236,811
kWh
Natural Gas $35,410 8,518
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $18,553 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,352

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.8113: Purchase gas directly from a contract gas supplier $5,666 - - $7,666
-
MMBtu
$(-2,000.0)
02 2.2437: Recover waste heat from equipment $2,849 - - $2,849
-
MMBtu
-
03 2.4221: Install compressor air intakes in coolest locations $2,893 $1,380 $2,893
46,307
kWh
- -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $275 $80 $275
4,396
kWh
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $2,816 $2,607 $2,816
45,135
kWh
- -
06 2.6232: Install set-back timers $2,508 $1,900 $2,508
40,152
kWh
- -
07 2.4133: Use most efficient type of electric motors $406 - $207
3,224
kWh
- $199
08 2.4133: Use most efficient type of electric motors $170 - $132
2,052
kWh
- $38
09 2.4133: Use most efficient type of electric motors $412 $200 $412
6,741
kWh
- -
10 2.4111: Utilize energy-efficient belts and other improved mechanisms $549 $40 $549
8,792
kWh
- -
11 3.4154: Eliminate leaks in water lines and valves $9 - - - $9
TOTAL RECOMMENDED $18,553 $6,207 $9,792
156,799
kWh
$10,515
-
MMBtu
$(-1,754.0)
TOTAL IMPLEMENTED $6,352 $2,887 $3,503
56,272
kWh
$2,849
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs