Assessment Year | 1990 |
---|---|
Principal Product | SOFT DRINKS |
NAICS |
n/a
|
SIC | 2086: Bottled and Canned Soft Drinks and Carbonated Waters |
Sales Range | $10 M to 50M |
# of Employees | 74 |
Plant Area |
n/a
|
Annual Production | 5,500,000
pieces
|
Production Hrs. Annual | 5,334
hrs
|
Location (State) | Texas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $176,276 | 2,786,049 |
kWh
|
$0.063 |
Natural Gas | $45,314 | 11,216 |
MMBtu
|
$4.04 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $18,317 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $14,830 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.2135: Repair and eliminate steam leaks | $10,825 | $1,000 | - |
$10,825
-
MMBtu
|
|
02 | 2.2414: Use waste heat from hot flue gases to preheat | $3,020 | $9,750 |
$(-5,720.0)
(-99,648)
kWh
|
$8,740
-
MMBtu
|
|
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,575 | $700 |
$2,575
63,599
kWh
|
- | |
04 | 2.2511: Insulate bare equipment | $640 | $370 |
$640
15,826
kWh
|
- | |
05 | 2.4221: Install compressor air intakes in coolest locations | $460 | $300 |
$460
11,430
kWh
|
- | |
06 | 2.3132: Recharge batteries on during off-peak demand periods | $330 | - |
$330
-
kWh
|
- | |
07 | 2.2511: Insulate bare equipment | $290 | $710 | - |
$290
-
MMBtu
|
|
08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $37 | $27 |
$37
586
kWh
|
- | |
09 | 2.6232: Install set-back timers | $140 | - |
$140
3,517
kWh
|
- | |
TOTAL RECOMMENDED | $18,317 | $12,857 |
$(-1,538.0)
(-4,690)
kWh
|
$19,855
-
MMBtu
|
||
TOTAL IMPLEMENTED | $14,830 | $2,370 |
$4,005
90,855
kWh
|
$10,825
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs