ITAC Assessment: AM0129
ITAC logo
ITAC Assessment: AM0129
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product BUSINESS FORMS
NAICS
n/a
SIC 2761: Manifold Business Forms
Sales Range $10
M
to 50
M
# of Employees 106
Plant Area
n/a
Annual Production 7,300,000
lb
Production Hrs. Annual 6,000
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $74,928 1,820,047
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $7,244 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.4133: Use most efficient type of electric motors $243 $336 - $243
-
MMBtu
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $746 - $1,106
26,084
kWh
- $(-360.0)
03 2.7111: Reduce illumination to minimum necessary levels $660 $755 $660
12,309
kWh
- -
04 2.3131: Reschedule plant operations or reduce load to avoid peaks $2,875 $32 $2,875
-
kWh
- -
05 2.7212: Install or upgrade insulation on hvac distribution systems $370 - $370
15,826
kWh
- -
06 2.3212: Optimize plant power factor $2,350 $2,000 $2,350
-
kWh
- -
TOTAL RECOMMENDED $7,244 $3,123 $7,361
54,219
kWh
$243
-
MMBtu
$(-360.0)
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs