ITAC Assessment: KU0381
ITAC logo
ITAC Assessment: KU0381
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product PAPER BAGS
NAICS
n/a
SIC 2673: Plastics, Foil, and Coated Paper Bags
Sales Range $5
M
to 10
M
# of Employees 50
Plant Area
n/a
Annual Production 14,000,000
pieces
Production Hrs. Annual 4,250
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $66,093 902,696
kWh
Natural Gas $1,865 423
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $4,869 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,647

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.7221: Lower temperature during the winter season and vice-versa $1,545 $20 $1,545
21,102
kWh
- -
02 2.7229: Air condition only space necessary $472 $2,300 $472
6,448
kWh
- -
03 2.7211: Clean and maintain refrigerant condensers and towers $150 $30 $150
2,052
kWh
- -
04 2.6232: Install set-back timers $751 $700 $751
10,258
kWh
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $83 - $107
1,465
kWh
- $(-24.0)
06 2.3131: Reschedule plant operations or reduce load to avoid peaks $667 - $667
-
kWh
- -
07 2.2437: Recover waste heat from equipment $450 $716 - $450
-
MMBtu
-
08 2.4221: Install compressor air intakes in coolest locations $322 - $322
4,396
kWh
- -
09 2.4111: Utilize energy-efficient belts and other improved mechanisms $429 $1,400 $429
5,862
kWh
- -
TOTAL RECOMMENDED $4,869 $5,166 $4,443
51,583
kWh
$450
-
MMBtu
$(-24.0)
TOTAL IMPLEMENTED $3,647 $2,866 $3,197
43,670
kWh
$450
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs