ITAC Assessment: KU0369
ITAC logo
ITAC Assessment: KU0369
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product STEEL SERVICE
NAICS
n/a
SIC 3441: Fabricated Structural Metal
Sales Range $10
M
to 50
M
# of Employees 53
Plant Area
n/a
Annual Production 1,500,000
lb
Production Hrs. Annual 6,048
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $66,689 766,413
kWh
Natural Gas $48,820 12,173
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $32,166 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,637

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.8113: Purchase gas directly from a contract gas supplier $14,242 - - $14,242
-
MMBtu
-
02 2.7231: Use radiant heater for spot heating $10,390 $38,850 - $10,390
-
MMBtu
-
03 2.7261: Install timers and/or thermostats $1,781 $430 $1,224
14,068
kWh
$557
-
MMBtu
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $466 $1,769 $466
5,275
kWh
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $366 - $408
4,689
kWh
- $(-42.0)
06 2.6232: Install set-back timers $918 $750 $918
10,551
kWh
- -
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,856 $125 $2,856
32,825
kWh
- -
08 2.1311: Replace electrically-operated equipment with fossil fuel equipment $1,147 - $1,428
16,413
kWh
$(-281.0)
-
MMBtu
-
TOTAL RECOMMENDED $32,166 $41,924 $7,300
83,821
kWh
$24,908
-
MMBtu
$(-42.0)
TOTAL IMPLEMENTED $4,637 $555 $4,080
46,893
kWh
$557
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs