Assessment Year | 1992 |
---|---|
Principal Product | STEEL SERVICE |
NAICS |
n/a
|
SIC | 3441: Fabricated Structural Metal |
Sales Range | $10 M to 50M |
# of Employees | 53 |
Plant Area |
n/a
|
Annual Production | 1,500,000
lb
|
Production Hrs. Annual | 6,048
hrs
|
Location (State) | Missouri |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $66,689 | 766,413 |
kWh
|
$0.087 |
Natural Gas | $48,820 | 12,173 |
MMBtu
|
$4.01 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $32,166 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $4,637 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.8113: Purchase gas directly from a contract gas supplier | $14,242 | - | - |
$14,242
-
MMBtu
|
- | |
02 | 2.7231: Use radiant heater for spot heating | $10,390 | $38,850 | - |
$10,390
-
MMBtu
|
- | |
03 | 2.7261: Install timers and/or thermostats | $1,781 | $430 |
$1,224
14,068
kWh
|
$557
-
MMBtu
|
- | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $466 | $1,769 |
$466
5,275
kWh
|
- | - | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $366 | - |
$408
4,689
kWh
|
- | $(-42.0) | |
06 | 2.6232: Install set-back timers | $918 | $750 |
$918
10,551
kWh
|
- | - | |
07 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,856 | $125 |
$2,856
32,825
kWh
|
- | - | |
08 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $1,147 | - |
$1,428
16,413
kWh
|
$(-281.0)
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $32,166 | $41,924 |
$7,300
83,821
kWh
|
$24,908
-
MMBtu
|
$(-42.0) | ||
TOTAL IMPLEMENTED | $4,637 | $555 |
$4,080
46,893
kWh
|
$557
-
MMBtu
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs