| Assessment Year | 1992 |
|---|---|
| Principal Product | STEEL SERVICE |
| NAICS |
n/a
|
| SIC | 3441: Fabricated Structural Metal |
| Sales Range | $10 M to 50M |
| # of Employees | 53 |
| Plant Area |
n/a
|
| Annual Production | 1,500,000
lb
|
| Production Hrs. Annual | 6,048
hrs
|
| Location (State) | Missouri |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $66,689 | 766,413 |
kWh
|
$0.087 |
| Natural Gas | $48,820 | 12,173 |
MMBtu
|
$4.01 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $32,166 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $4,637 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.8113: Purchase gas directly from a contract gas supplier | $14,242 | - | - |
$14,242
-
MMBtu
|
- | |
| 02 | 2.7231: Use radiant heater for spot heating | $10,390 | $38,850 | - |
$10,390
-
MMBtu
|
- | |
| 03 | 2.7261: Install timers and/or thermostats | $1,781 | $430 |
$1,224
14,068
kWh
|
$557
-
MMBtu
|
- | |
| 04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $466 | $1,769 |
$466
5,275
kWh
|
- | - | |
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $366 | - |
$408
4,689
kWh
|
- | $(-42.0) | |
| 06 | 2.6232: Install set-back timers | $918 | $750 |
$918
10,551
kWh
|
- | - | |
| 07 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,856 | $125 |
$2,856
32,825
kWh
|
- | - | |
| 08 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $1,147 | - |
$1,428
16,413
kWh
|
$(-281.0)
-
MMBtu
|
- | |
| TOTAL RECOMMENDED | $32,166 | $41,924 |
$7,300
83,821
kWh
|
$24,908
-
MMBtu
|
$(-42.0) | ||
| TOTAL IMPLEMENTED | $4,637 | $555 |
$4,080
46,893
kWh
|
$557
-
MMBtu
|
- | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs